Building Installation Work – Construction Of A Training Hall, Che. The Foundations, Including Piles And Retaining Walls, Are Reinforced Concrete. The Hall And Vestibule Have A Designed Galvanized Steel Frame Structure. The Balcony At The Level Of The Existing Hall And Vestibule Will Be Made Of A Concrete Slab On A Steel Structure And Columns. The Staircase Will Be Made Of Reeds. The Doors Will Be Sectional, Insulated With An Electric Drive. The Doors Will Be Aluminum. The Perimeter Shell Will Be Based On A Concrete Threshold With Insulation And Will Be Made Of Light Metal-Mineral Wool-Metal Panels, Just Like The Roof. In The Vestibule, The Low-Pitched Roof Will Be Supplemented With Roofing Foil For Flat Roofs. In The Training Hall, There Will Be Distribution Of Fire Water Supply, Gas Pipeline To Heating Units, Electricity For Lighting, Sockets And Sports Equipment. The Fire Water Supply Connection Will Be In The Corridor Of The Existing Hall Near The Elevator. In Order To Reduce Pressure Losses, A New Gas Pipeline Will Be Established In The Existing Route From Hup. The Gas Meter And Connection Of The Existing Gas Boiler In The Hall Will Be In The Existing Location. The Electricity Will Be Connected In The Substation Of The Existing Hall. Heating And Ventilation Will Be Provided By Four Heating And Ventilation Units (Saharas) 29.8 Kw. The Air Extraction From The Hall Area Will Be Ensured By A Fan Of 8000 M3/H With A Pipe To Ensure The Uniformity Of The Extraction.
Contact Information
Address
náměstí Krále Jiřího z Poděbrad 1
Contact No.
+420 354440172
Email
gyepesova@cheb.cz
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116532980
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.