Construction Work For Mining – Construction Of A Drilling Site For Geothermal Drilling. The Planned Geothermal Drilling Site Essentially Consists Of Three Structurally Separate Areas. The Inner Drilling Site Area Consists Of The Foundations For The Deep Drilling Rig Including The Drilling Cellar. The Deep Drilling Rig Including All Ancillary Facilities Will Be Built In This Area And Operated During The Drilling Phase. It Therefore Serves As A Storage Area For All Parts Of The Deep Drilling System, Including The Energy Supply And The Storage Of Mud Materials, Emergency Diesel And Drill Rods. The Outer Area Serves To Access And Continuously Bypass The Inner Area And Is Therefore Primarily Intended As A Traffic Route Including Heavy Oil Transport. Outside The Outer Area There Are Container And Storage Areas That Are Required For The Operation Of The Drilling Rig. In Addition, Storage Basins Are To Be Built Outside For Thermal Water Pumping Tests (Each At The End Of A Deep Borehole). The Inner Drilling Site Area Is Subject To The Requirements Of The Awsv, Which Is Why Special Structural Designs Are Required In Terms Of Material Quality, Drainage Facilities, Refueling Areas, Etc. As Part Of This Offer Request, The Turnkey Construction Of The Entire Drilling Site With All Drilling Site Areas Including The Necessary Ancillary Facilities Such As Fencing, Etc. Is Requested.
Contact Information
Address
Maximilianstraße 39
Contact No.
+49 (0)89 12 50 30 220
Email
vergabe.gemo@arvensteyn.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116532540
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.