|
The Subject Of The Order Includes Comprehensive Modernization Of The Cloakroom, Sanitary Facilities And Entrance Hall, As Well As Adapting The Facility To The Needs Of People With Disabilities. The Scope Of Work Includes Construction, Installation And Finishing Works, As Well As Delivery And Assembly Of Equipment. The Part Regarding Cloakrooms And Sanitary Facilities Includes Reconstruction Of The Functional Layout Of The Rooms, Construction Of A Sanitary Facility For People With Disabilities, Demolition And Masonry Works, Installation Of Plasterboard Walls, Replacement Of Suspended Ceilings, Floors, Wall Cladding, Door And Window Joinery, And Painting And Wall Protection Works. The Scope Also Includes The Modernization Of The Electrical, Central Heating, Water, Sewage And Ventilation Installations, Along With The Installation Of New Sanitary Fittings And Cloakroom Equipment. In The Entrance Hall, It Is Planned To Renovate The Ceilings, Replace Floor Coverings, Paint And Protect The Walls. Additionally, Kitchen Facilities Will Be Constructed, Including The Construction Of A Partition Wall, The Necessary Water, Sewage And Electrical Installations, And The Installation Of Furniture And Kitchen Equipment. The Scope Of The Order Also Includes The Arrangement Of The Hall Through The Delivery And Assembly Of Furniture, Decorative Elements And Decorative Lighting. The Entire Work Is Aimed At Improving The Functionality, Aesthetics And Standard Of Use Of The Facility, Increasing Its Accessibility For People With Disabilities And Adapting The Rooms To The Applicable Technical And Utility Requirements. The Contractor Is Responsible For Any Damage Caused During The Performance Of The Works. All Work Must Be Carried Out In Compliance With All Safety And Occupational Health And Safety Rules. Construction Products Covered By The Order Should Meet The Requirements Resulting From Polish Standards Transposing European Standards Pn-En (Harmonized Standards). The Detailed Scope Of The Order Is Included In The Order Documents, I.E., Among Others: Technical Specifications For Execution And Acceptance, Bill Of Quantities, Offer Cost Estimate And Draft Provisions Of The Contract. The Order Is Being Implemented As Part Of The Task Entitled Renovation Of The Hall And Locker Room With Sanitary Facilities In The Bowling Alley Building In Wronki, Co-Financed By The Fund For The Development Of Physical Culture, Administered By The Minister Of Sport And Tourism, As Part Of The Clocker Room For A Medal - 2026 Edition Program.
|