Quotation are invited for Secondary Fuel Nozzle Refurbishment 1-E Station Phase-1; Ge Frame 1032602263 1 ITEM-00001 1PCS SECONDARY NOZZLE REFURBISHMENTA.4. REPAIRS - 9E FUEL NOZZLES - SECONDARYA.4.1. INSPECTION ONLY# RECEIVE, UNBOX AND VISUALLY INS PECT TO ASSESS OVERALL INCOMINGCONDITION OF SECONDARYFUEL NOZZLES (SFN)# RECORD DRAWING AND SERIAL NUMBERS AND RECORD OF PREVIOUS RE PAIRS, IFVISIBLE/LEGIBLE# PERFORM INCOMING FLOW TEST.# CLEAN COMPONENTS AND BODIES.# PERFORM VISUAL INSPECTIONS OF ALL COMPONENTS (O UTER SLEEVE, OILSTICKS, AND WATER TUBES).RED DYE INSPECT ALL WELDS ON BODIES. DIMENSIONAL INSPECTIONS OF OILSTICK SHROUDS ANDOUTER S LEEVE TIPS.# BACKFLUSH OUTER SLEEVE PILOT PASSAGE.# PERFORM ENGINEERING REVIEW OF LINER INSPECTION RESULTS AND ISSUEINSPECTION/CONDI TIONREPORT.A.4.2. LIGHT REPAIR# REPLACE ALL LIP SEALS.# REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# 1 EA FLOW-TES T GAS PASSAGES/ADJUST.# FLOW-TEST GAS PASSAGES TO IDENTIFY LEAKS ACROSS PISTON RINGS.# FLOW-TEST LIQUID PASSAGES/ADJUST (DUAL FUEL O NLY)# C-SEAL LEAK CHECK ALL COVERS.# FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OFINTERNA L PASSAGES)# PREPARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.# PACK IN CONTAINERS AND PREPARE FOR SHIPMENT.A.4.3. M EDIUM REPAIR# REPLACE ALL LIP SEALS.# PERFORM WELD REPAIR INDICATIONS ON UP TO 50% FN BODIES FOUND DURINGRED DYE INSPECTIONS.# REPAI R UP TO 50% OF OUTER SLEEVE TIPS FOUND TO FAIL THE VISUAL ORDIMENSIONAL INSPECTION.# REPAIR UP TO 50% OF OUTER SLEEVE PEGS THAT FAIL VISUAL INSPECTIONS ORFLOWS DURING THE FINALFLOW PROCESS.# REPLACE C-SEALS GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# FLOW TEST GAS PASSAGES/ADJUST.·#FLOW-TEST GAS PASSAGES TO IDENTIFY LEAKS ACROSS PISTON RINGS.·#FLOW-TEST LIQUID PASSAGES/ADJUST (DUAL FUE L ONLY)·#C-SEAL LEAK CHECK ALL COVERS.·#FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OF INT ERNAL PASSAGES)·#PREPARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.·#REPLACE BOXES WITH NEW (AS NECESSARY)·#PACK IN C ONTAINERS AND PREPARE FOR SHIPMENT.NOTE: SUPPLY OF PARTS ADDITIONAL TO CONSUMABLES WILL CHARGE AS EXTRAA.4.4.#HEAVY REPAIR·#REPLACE ALL LIP SEALS SPECIAL NOTES / INSTRUCTIONS: 1-E STATION PHASE-1; GE FRAME 9E AGP 32K DLN UPGRADED GAS TURBINE UNITS; SECONDARY FUEL NOZZLE REFURBISHMENT. FOR FURTHER DETAILS, PLEASE CONTACT: AHMED ZAKARIA (0524781810)AHMED.ELDALY@DEWA.GOV.AE / ASM MYNUDDIN (0503620814) MYNUDDIN.HOSSAIN@DEWA.GOV.AE / MARWAN AL MHEIRI (0501136322) MARWAN.ALMHEIRI@DEWA.GOV.AE STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601833)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116405225
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.