|
Engineering Design Services For The Construction Of Civil Engineering Works - Update Of Documentation For Stage 1 Of The Construction Of The Regional Road Racibórz-Pszczyna On The Section From Ul. Rybnicka In Raciborz To Ul. Pstrązka In Rzuchów (Dw 923). 1. The Subject Of The Order Is To Update The Construction, Surveying And Environmental Design Documentation For Stage 1 Of The Racibórz - Pszczyna Regional Road, I.E. On The Section From Ul. Rybnicka In Racibórz To Ul. Pstrązka In Rzuchów. The Documentation Prepared So Far Covers Stage 1, I.E. Starting Before The Intersection With Ul. Rybnicka And Piaskowa (Provincial Road No. 935 And District Road) To Ul. Pstrązka In Rzuchów (Provincial Road No. 923), Junction Outside The Scope Of The Study Of Stage 1. Road Class: Gp Cross-Section: 2/2 Length Of The Section Covered By The Update: Approx.: 10,750 M 2. Scope Of Updating The Design Documentation: The Update Will Include, Among Others: 1) Preparing A Map For Design Purposes, 2) Conducting Industry Interviews, 3) Obtaining Extracts From The Land Register, 4) Update Of The Land Development Project, 5) Update Of The Architectural And Construction Project In The Field Of The Road Industry And Engineering Structures, As Well As The Greenery Development Project, 6) Update Of The Designs Of Sanitary Networks And Electrical And Telecommunications Networks, 7) Performance Of A Road Safety Audit, 8) Preparation Of An Application For Issuing A Zrid Decision, 9) Preparation Of A Cadastral Map With Demarcation Lines, 10) Preparation Of A Map With The Route Of The Road, Marking The Area For Construction Facilities And The Existing Infrastructure, 11) Carrying Out An Analysis Of The Roads Connections With Other Public Roads, 12) Determining Changes In The Existing Land Development Infrastructure, 13) Obtaining Opinions Required By The Special Road Act, 14) Updating Real Estate Division Projects, 15) Updating The Traffic Forecast For The Entire Unbuilt Course Of The Racibórz - Pszczyna Regional Road, 16) Preparing A Nature Inventory, 17) Preparing Another Environmental Impact Report, 18) Preparing An Executive Design, 19) Preparing A Project For Changing The Traffic Organization For The Duration Of The Construction Of The Tor And The Project For The Target Traffic Organization Of The Dor 20) Preparing A Bill Of Quantities Of Works In The Technological System, For Each Industry And In The Specification System (Ter), Preparing Technical Specifications And Acceptance Of Construction Works, Preparing An Investor Cost Estimate For All Industries - Detailed And Simplified Layout And In The Form Of Ter, 21) Preparing A Technical Design, 22) Preparing Designs For The Demolition Of Colliding Structures, 23) Obtaining Water Permits The Update Includes, Among Others: Adaptation Of Documentation To Applicable Technical And Construction Regulations Regarding Public Roads. As Part Of The Task, It May Be Necessary To Update (Or Obtain New) Decisions, Arrangements And Opinions, Including Current Geological And Mining Conditions Or To Supplement The Geotechnical Foundation Conditions. The Documentation Should Treat The Railway Line No. 176 From Racibórz-Markowice To Olza As Liquidated. Therefore, There Is No Need To Maintain Its Continuity. 2. A Detailed Description Of The Subject Of The Order Is Provided By: - Description Of The Contractor
|