Architectural, Construction, Engineering And Inspection Services – Go4wohnen - Erftstadt Wohnen Am Campus - Traffic Report. Performance Pictures With This Award Procedure, An Expert Traffic Planning And Engineering Office Is To Be Commissioned To Prepare A Traffic Report To Accompany The Development Plan Process For Living On The Campus In Erftstadt-Liblar. The Traffic Report Serves To Provide Early Technical Validation Of The Land-Use Planning And Must Be Presented As A Technical Contribution Relevant To The Consideration. The Aim Is To Comprehensibly Determine And Evaluate The Traffic Impacts Of The Planned Residential Development On The Campus In Erftstadt-Liblar On The Existing And Planned Traffic Network And To Demonstrate Their Performance. The Development Structure Provided For In The Master Plan Should Be Examined From A Traffic Perspective And Optimized If Necessary. The Basis Of The Study Is The Present Urban Planning Framework Plan, Which Is Also The Basis Of The Development Plan Process. The Development Concept Anchored In The Master Plan Is Not To Be Developed Anew, But Rather To Be Technically Validated In Terms Of Its Performance, Traffic Safety, Feasibility And Future Viability As Part Of The Traffic Report. Since No Current Traffic Count Data Is Available, Independent Traffic Surveys Must Be Carried Out As Part Of The Processing. The Survey Concept Must Be Agreed With The Client And Form Part Of The Report. The Services Include In Particular The Following Content: - Basic Determination And Investigation Demarcation - Site Visit, Inventory Analysis And Traffic Surveys - Traffic Forecast And Traffic Generation Calculation - Proof Of Performance - Traffic Validation Of The Development Structure - Integrated Mobility Concept, Assessment And Expert Recommendation - Report Dates Implementation Period The Contractor Is Scheduled To Start Work Immediately After The Order Is Placed. The Traffic Report Is Required As A Technical Basis For The Development Plan Procedure No. 201 Living On Campus And Should Be Available In Particular For Early Participation In Accordance With Section 3 Paragraph 1 Of The Baugb. Against This Background, Rapid Processing Of The Expert Services Is Necessary. The Contractor Must Organize The Processing In Such A Way That The Essential Results Of The Traffic Investigation, Including The Forecast Considerations And The Traffic Assessment, Are Available At An Early Stage And Can Be Incorporated Into The Further Planning Process. The Specific Processing Deadlines Will Be Agreed Upon With The Client When Placing The Order. It Should Be Taken Into Account That Traffic Surveys Must First Be Carried Out, As No Current Counting Data Is Available. The Results Of These Surveys Form The Basis For The Subsequent Analyzes And Forecast Calculations. The Contractor Must Regularly Coordinate The Work Progress With The Client And Ensure That Interim Results Are Available In Time For The Further Planning Process.
Contact Information
Address
Hansaallee 299
Contact No.
+49 23143410
Email
zentralevergabe@nrw-urban.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116397538
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.