Quotation Are Invited For Tank 03 Surface Preparation And Protective Coating At M Station, Jebel Ali 1032603094 1 Item-00001 Technical Specification: Dfo Tank 03 Surface Preparation And Protective Coating At M Station, Jebel Ali1. Scope Of Work##The Scope I Ncludes Provision For Carrying Out The Painting Work, Site Preparation, Surface Preparation As Below Table, Supply & Application Of Most Suitable Protective Coatings As Per Existing Coating System (Jotun Tank Guard Grey Colour) On Internal Surfaces Of The Follow Ings:O#Roof Top Side # 250 M2 (Damaged Area)O#Ceiling # 300 M2 (Damaged Area)O#Additional Area (Columns, Bottom Surfaces & Other Int Ernal Surfaces) # 200M2o#No Of Mobilization # 02 Times#Surface Preparation(Sspc)#Application##No. Ofcoat#Paint Name#Min. D.F.T(#)#Co Lourdiesel Oil Storagetank Outside#Sp10(Sa 2 1/2)#1St#Inorganic Zinc Primer#75#As Per Site##2Nd#Epoxy 250 M2 Polyamide#125###3Rd#Aliphati C Polyurethane#50#Diesel Oil Storage Tank # Inside (Bottom & 1M Height Of Tank) And Additional Area (Columns, & Other Internal Surfa Ces)#Sp5(Sa 3)#1St#High Build Multi-Purpose Polyamide Epoxy#150###2Nd#High Build Multi-Purpose Polyamide Epoxy#150###Supply Of Blast Ing Abrasives, Sealants, Cleaning Agents, All Applicable Coating Materials, Application / Inspection Tools & Equipment And All Requi Red Consumables Including Tarpaulin And Green Mesh To Cover The Area In Order To Protect The Environment From Spill/Splash Of Blasti Ng Abrasives And Painting Materials##Joint Inspection To Be Carried Out For Roof Section, Ceiling, Bottom And Annular Plate Includin G All Columns And Pipe And Pipe Supports Etc. Following The Cleaning & Before Apply The Paint/Coatings To Ensure No Corrosion Damage S Which Need To Repair / Replace By Dewa.##The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Etc., Before He Submit His Quotation. Dewa Will Not Accept Any Claim For Extras Beyond The O Rder Rates / Prices During And After The Execution Of Work Ordered.##Complete Removal Of The Existing Coating To Bare Metal By Blast Ing Cleaning Mentioned Above.##After Sandblasting, Dewa Will Carry Out Will Inspect The Surface For Any Defect And Rectification If Required Will Be Done Accordingly By Dewa.# Dfo Tank 03 Surface Preparation And Protective Coating At M Station, Jebel Ali. Scope Of Work Enclosed Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2412601293)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116350334
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.