|
Request for proposals for Engineering Procurement Construction (Epc) Contractor plus Finance for an Additional 10mw Hydropower Generating Unit at the Existing Maguga Hydropower Station 4. SCOPE OF WORK The Project comprises brownfield expansion works at the existing Maguga Hydropower Station to add approximately 10 MW of installed capacity while maintaining the safe and reliable operation of the existing dam and power generation facilities. The Bidder should anticipate that the optimal technical solution will be confirmed through detailed hydrology review, hydraulic transient analysis, geotechnical investigations, and interface studies with existing civil structures, waterways, and electrical systems. 4.1.1. Conceptual Scope (Indicative) The final scope will be confirmed through further engagements with the successful Bidder following the RFP process, including clarifications, technical and commercial discussions, and negotiations, with a view to entering into an agreement with the Bidder giving the most economical and advantageous commercial offer. The Bidder may be a single qualified EPC contractor, developer, investor, or an EPC/developer/investor-led consortium, provided that the Bidder clearly demonstrates the capability, commitments, and contractual arrangements required to deliver the complete solution. At a minimum, Bidders should assume responsibility for the following, as applicable to the proposed delivery model: Submit a comprehensive proposal for delivery of the complete project, including the technical offer, financial and financing offer, commercial offer, and a clear methodology for implementation, integration, testing, commissioning, and handover. Arrange or secure project financing, support achievement of financial close, and submit a commercial offer showing how the investment cost will be recovered through an agreement between the Contractor and the Employer, including the proposed tariff or payment mechanism, agreement tenure, key commercial assumptions, and payment security arrangements. Review and validate available project information, site data, studies, drawings, and interface requirements with the existing plant. Undertake all detailed engineering and design necessary for the new 10 MW hydropower unit and associated facilities. Name Bank Account number Branch Swaziland Electricity Company Standard bank 9110003236261 Swazi Plaza Swaziland Electricity Company Nedbank 20000286843 Mbabane Swaziland Electricity Company First National Bank 62154679735 Mbabane The Bidder shall bear all costs associated with preparation and submission of RFP. D. Tender Security A Tender Security of E50,000.00 from a reputable financial institution or insurance company is required Tender Upload Date: Friday 3rd July 2026 8:48 am Submission Deadline: Monday 31st August 2026 11:00 pm Tender Link : https://esppra.co.sz/sppra/documents/tenders/Eswatini Electricity Company (EEC)/1785319545.pdf
|