|
Construction Work For Water And Sewage Pipelines – Design And Execution Of Works Within The Project Extending The Water Supply Networks And Establishing The Domestic Sewage Network In The Municipality Of Burjuc, Hunedoara County. This Project Proposes: - The Expansion Of The Water Supply Networks In The Villages Of Petresti, Bradatel, Glodghilesti And Tisa; - The Establishment Of The Domestic Sewage Network In The Villages Of Petresti, Bradatel, Glodghilesti, Burjuc, Tatarasti And Tisa, From Burjuc Commune, Aiming To Improve The Social And Economic Situation And A Dynamic Of The Human Development Of The Population. Household Wastewater Will Be Collected And Then Transported Through The Orchards To The Existing Treatment Plant In The Town Of Ilia. Through This Project, The Existing Sewage Treatment Plant In The Town Of Ilia Will Be Modernized To Ensure The New Capacities Resulting From The Implementation Of The Project. For The Execution Of The Water Supply Networks, Peid Pe100 Pn10 Or Peid Pe100 Pn16 Pipes Will Be Used, Depending On The Need, With Diameters Between De63mm ... De110mm, Joined By Thermofusion Or Electrofusion. For The Construction Of Sewer Collectors, Pvc-Kg Sn4 Dn200 And Dn250mm Pipes Will Be Used In General, With Sealed Joints, In Compliance With The Installation And Operating Conditions Imposed By The Manufacturer. The Resistance And Stability Of These Pipes Is Conferred By The Resistance To Temperature Variations, To Abrasion And Corrosion, To Chemical, Mechanical And Seismic Agents. The Water Supply Networks And Domestic Sewage Networks Will Be Located On The Public Domain, Along The Streets Of The Locality, Outside The Road Area As Much As Possible, Near The Boundary With The Neighboring Properties. The Villages Of Petresti, Bradatel And Glodghilesti Will Be Supplied By Taking The Necessary Amount Of Water By Making Two Boreholes (F1 And F2), Equipped With A Submersible Electric Pump Each (Pf1 And Pf2), Hydraulic Equipment, Drilling Cabin, Command, Monitoring And Control. At The Capture Front, The Appropriate Electrical Connection Will Be Ensured! The Water Utility Supplies Water To The Above-Ground Storage/Compensation Tank. The Village Of Tisa Will Be Supplied By Taking The Required Amount Of Water By Making Two Boreholes (F1 And F2), Equipped With A Submersible Electric Pump (Pf1 And Pf2) Each, Hydraulic Equipment, Drilling Cabin, Command, Monitoring And Control. At The Capture Front, The Appropriate Electrical Connection Will Be Ensured! The Water Utility Supplies Water To The Above-Ground Storage/Compensation Tank. Fire Hydrants Were Planned To Be Installed On The Distribution Network According To The Situation Plans In The Technical Project. The Works Fall Into The C-Normal Importance Category (According To Hgr No. 766/1997) And To The Iii Importance Class (According To The Normative P100-1/2013). The Duration Of The Contract Will Be A Maximum Of 57 Months (3 Months (Design) + 18 Months Execution Of Works + 36 Months Warranty Period) From The Issuance Of The Administrative Order To Start The Services, Conditional On The Establishment Of The Guarantee Of Good Execution. Maximum 3 Months Duration For Design Services (The Duration Of Design Services Is Included Between The Date Of The Start Order Issued By The
|