The Subject Of The Order Are Construction Works Related To The Thermal Modernization Of An Existing Warehouse And Garage Building With A Social And Office Part, Inventory No. 104/1008, At Ul. Księdza Rogowskiego 62A In Kalety (42-622 Kalety), In Accordance With The Design Documentation, Stwior And The Bill Of Quantities Constituting An Integral Part Of This Swz. Location Of The Facility Covered By The Requested Task: Ul. Księdza Rogowskiego 62, 42-660 Kalety, Registration Plot No. 241301_1.0001.Ar_18.568/42. Material Scope, According To The Project: Dismantling Works: – Remove All Ventilation Grilles; – Remove All External Lamps; – Remove All Lighting Switches; – Temporarily Dismantle The Lightning Protection System; – Dismantle For The Time Of Insulation Downpipes And Secure The Drainage Of Rainwater From The Roof; - For The Duration Of Insulation, Completely Dismantle The External Heat Pump Unit Or Immediately Adjust Its Hangers To Suit The Expected Insulation Thickness; - Dismantle A 30 Cm Wide Strip Of Paving Stones Around The Building In Order To Insulate Below The Existing Surface. Construction Works To Be Performed: - Insulating The Roof Slope Between The Rafters With Mineral Wool. Only Pvc Foil Should Be Used To Finish The Roof From The Inside - A Vapor Barrier; - Removal Of Any Loose Plaster Fragments And Filling In Larger Gaps; - Priming The Existing Plaster To Strengthen It - A Deep Penetrating Primer; - Insulating The Wall With A Light Wet Method Using Styrofoam Thickness. 18Cm. As A Finishing Layer, Apply Thin-Layer Structural Plaster On A Mesh - Kabe Or Caparol System Solutions Or Equivalent, And Mosaic Structural Plaster On A 35 Cm High Plinth; - Perform All Adhesive Coatings On A Fiberglass Mesh, Min. 165G/M2; – Making New Flashings Adapted To The New Thickness Of The Insulated Walls: Flashings At The Existing Entrance Roof And Window Sills Of Various Widths; – Install The Lightning Protection System In Appropriate System Pipes And Hide It In The Insulation Layer. Use Inspection Doors (Flaps) At The Connection Of The Vertical Air Terminals With The Pipework; - Install The Dismantled Downpipes On Anchors Adapted To The Insulation Thickness And Correct The Connection Of The Pipes To The Settling Tanks In The Pavement Surface Around The Building; - Perform The Designed Insulation Around The Existing Energy Boxes On The Facades And Around The Existing Fire Protection Switch Button - Without Dismantling Them And With Appropriate Protection; - Install New Facade Lamps External; – Install New Ventilation Grilles With Dimensions Similar To Those Removed; – Install New Lighting Switches Intended For Installation Outside The Building; – If Necessary, Correct The Lengths Of The Installation Cables; – Install All Dismantled Information Signs In Their Original Places On The Facades. The Detailed Scope Of The Subject Of The Order And The Minimum Parameters Are Specified In The Design Documentation And The Technical Specification For The Executi
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 116006078
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.