The Subject Of The Order Includes The Completion Of Construction Works Started By The Previous Contractor, Consisting In The Expansion Of The Volunteer Fire Department Building For The Needs Of The Volunteer Fire Department, A Nursery And The Social Services Center, In Accordance With The Attached Design Documentation. The Scope Of Work Will Also Include Land Development In Accordance With The Attached Design Documentation. In The Scope Of Construction Works Related To The Building, The Contractor Will Be Obliged To Complete The Commenced Works, I.E. Insulation And Finishing Of The Facade (Mesh, Glue, Ground, Structure - Facade Finishing Materials), Roof Sheathing With Insulation And Installation Of Sheet Metal, Gutters, Downpipes, Sheet Metal Flashing, Execution Of External Lightning Protection Installation, Execution Of Facade Inscriptions, Execution Of Internal And External Window Treatments. And Door Installation, Installation Of The Ei120 Roller Shutter, Installation Of An Elevator In The Existing Elevator Shaft, Construction Of Internal Partition Walls, Execution Of Electrical Installation With Complete Installation Of Plug Sockets, Lighting, Emergency Lighting And Power Supply For Technical Equipment, Execution Of Water And Sewage Installation Along With All Approaches To Washbasins, Sinks, Toilet Bowls And Dishwashers Along With The Delivery And Installation Of Final Sanitary And Electrical Equipment, Execution Of The Surface Of The External Terrace Marked On The Architectural Projections 1St Floor With The Symbol Z.1.T In A Structure Enabling The Installation Of Playground Equipment Without Disturbing The Ceiling Structure Along With The Possibility Of Discharging Rainwater Into The Designed Downpipes, Taking Into Account The Terrace Layers In Accordance With The Design Revision Attached To This Procedure, Construction Of A Covered Connector On The External Terrace, Marked On The Architectural Plan Of The 1St Floor With The Symbol Z.1.12, In A Structure Consistent With The Assumptions Of The Design Documentation, Construction Of Railings On The Indicated External Terrace, Execution Supply And Exhaust Ventilation System With Heat Recovery And Mechanical Exhaust Ventilation From Hygienic And Sanitary Rooms, Construction Of A Gas Installation, Construction Of A Staircase Smoke Extraction Installation In Accordance With The Design Assumptions, Construction Of A Boiler Room With Complete Infrastructure - In Accordance With The Assumptions Of The Design Documentation, Construction Of A Heating Installation, Including A Radiator Installation And An Underfloor Heating Installation, Construction And Processing Of A Flue Gas Duct Located On The External Terrace, Marked On The Architectural Projections Of The First Floor With The Symbol Z.1.T, Including Technological Passages Through Marked Fire Zones, Execution Of Missing Internal And External Door Joinery, Including Installation Of Entrance Gates For Fire Brigade Vehicles, Construction Of Floors
|