|
Bids Are invited for Custom Bid For Services - Sporadic Work Outsourcing Package - Safety - Operation And Maintenance Of Safety Detection Systems And Fire Protection Systems And Maintain Log Books For 2 Years. , Preparation Of Stock Item And Segregating Pipe And Fitting And Consumable Item In Store Rack And Maintaining The Stock Register For 2 Years. , Preparation Of Bill Of Materials For Fire Protection Systems And Receipt Of Materials, Maintaining Logbook For Activities For Establishment Of Fire Protection Systems For 2 Years. , Mounting & Dismantling Of Flange Joints:- Mounting Refers To Aligning Of Pipe Flanges (2 Nos.) & Positioning Of Gasket Properly And Tightening The Flanges With Proper Torque With The Given Bolts & Studs For 2 Years. , Assembly & Removal Of Flanged Manual / Ep Valves/ Safety Relief Valves / Deluge Valves For 2 Years. , Sporadic Work Outsourcing Contract: Calibration Of H2/O2, Flame Detectors And Ensuring Its Fitness, Service, Dismantling/Mounting And Changing For 2 Years. , Sporadic Work Outsourcing Contract: Fabrication Of Safety Barricades & Sign Boards (Size: 75X75mm, 75X300mm, 400X600mm) For 2 Years. , Installation Of Safety Equipments - Mounting /Dismounting Safety Shower, Anemometer, Road Mirror, Wind Socks, Siren. Installation/Positioning Of Safety Barricade During Hazardous Operations For 2 Years. , Taking Measurement Of Piping, Equipment, Components At Site For Fire Protection Systems. Including Support Activities For General Equipment Maintenance Works For 2 Years. , Sporadic Work Outsourcing Contract: Charging Of Gn2 Cylinders With Gn2 During Test Operations At Cryo Test Stand For 2 Years. , Setting Of Pressure Regulator Involving Opening Of Discharge Valves Of High Pressure Gn2 Cylinders And Associated Manual Valves And Setting The Regulator To The Required Pressure Value 2 Years. , Shifting Of Structural Materials Like Angles, Channels, I-Beams, Pipes, Fittings, Etc., For 2 Years , Collecting Inputs On Safety Inspection, Surveillance, Support In Worksite/Test Activities For Cryo And Earth Storable Test Facilities & Storage Areas For 2 Years. , Mounting And Removal Of Pumps And Motors Of Remote Control Water Monitor And Other General Pumps & Motors For 2 Years. , Sporadic Work Outsourcing Contract: Mounting And Removal Of Ro Pumps And Motors: Trouble Shooting And Servicing For 2 Years. , Maintenance Of Ro Plant: Cleaning, Checking, Refitting, Topping-Up, Filling Anti Scalant, Handling Chemicals As Per Approved Procedures Etc., For 2 Years. , Scrubber Charging At Pts, Rcs, Lus-Tf, Sttf: Dismantling, Cleaning Process, Solution Preparation Etc., For 2 Years. , Air Compressor Operation For Charging Of (Scaba): Servicing, Assembling And Charging For 2 Years. , Air Compressor Periodic Maintenance (Preventative Maintenance, Oil Filling, Gaskets Changing, Belt Changing Etc) 03 Months Once For 2 Years. , Servicing And Maintenance Of Outdoor Weather Monitoring Board And Automatic Weather Station Maintenance And Ensuring Its Fitness At Various Locations (Once In 03 Months Approx) 2 Years. , Cleaning And Mounting/Dismantling Of Deluge Nozzles In Nos., Servicing Of Water Strainers (Sizes 50 Nb To 200 Nb) In Nos., For 2 Years , Operation Of Ro Plant In Cubic Meter: From Operation Of Feed Pump To Operation Of Permeate Supply (To Dm Plant) Pump For 2 Years , Drilling Of Holes In Ms/Ss Components And In Structure Shall Be Carried Out Either By Portable Hand Drilling Machine Or In Drilling Machine For 2 Years. , Painting Of Pipelines, Equipment, Fixtures And Structure Etc., For 2 Years. , Mounting And Dismantling Of Spring Loaded Regulator & Filter Assembly For 2 Years. , Preparation/Editing Of Auto Cad Drawings, Making Fabrication /Isometric Drawing, Layout Drawing And Correction Of Drawing For 2 Years. , General Housekeeping In The Form Of Removing All Unwanted Materials Lying In And Around The Work Place Regularly Once In A Week Or More Depending Upon The Need For 2 Years. , Mounting Of Detectors And Other Electronic Equipments And Storing. For The Weight Given Below: A. Weight<=10 Kgs, B. Weight >10 Kgs <= 25 Kgs Is Only Indicative For 2 Years. , Deo Work : Typing Of Technical Checklist (100 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Technical Specifications For (200 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Monthly Report For (10 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Leave / Tour Report For (50 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Indent Documentation For (90 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Letters / Fax Messages / Emails / Logistic Request For (200 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Procedure Documents And Manuals For (250 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Typing Of Minutes Of Meeting For (100 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Up-Keeping Inward / Outward Records Entries For (310 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Photocopy Of Documents And Records For (1300 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Scanning Of Documents And Records For (540 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years. , Filing And Organising Of Records And Documents For (310 Pages Per Month, Approx) The Above Is Only Indicative Numbers For The Duration Of 2 Years.
|