|
Upgrading Of Existing Self-Service Laundry Rooms: Electrical, Plumbing And Ancillary Works . Removal And Disposal Works, Supply And Install 3-Phase Power Supply Complete With Enclosure, Mccb, Rccb, Mcbs, Cabling, Containment, Termination & Commissioning, Supply And Install 2 X 13 A Power Points Including All Necessary Wiring, Accessories And Support, Supply And Install 32A Single Phase Isolaters Complete With All Necessary Mcbs, Cabling, Containment, Termination And Commissioning, Supply And Install Wall Mounted Ventilation Fan Complete With Switch Controls, Timer, Wiring, Mounting Accessories And Commissioning, Supply And Install Exhaust Fan, Complete With All Necessary Cabling, Switch Control, Timer, And Modification To The Existing Ventilation Panel, Where Required, Supply And Install Washing Machine Water Supply Points, Including All Necessary Pipework, Valves, Supports, And Mounting Brackets. Piping And Taps Shall Be Mounted Directly On The Wall, And All Necessary Support Shall Be Provided, Supply And Install Pvc Discharge Piping Connected To Existing Discharge Points, Including A Minimum 1.0M Vertical Upturn For Each Discharge Set And All Necessary Fittings And Supports, Supply And Install 3-Phase Power Meters For Hall G And E Laundry Room
|