Overview Of The Projectthe Planned Ramsay Elevated Guideway Construction Package Includingelevated Rail Structure Between The Ramsay/Inglewood Station Atapproximately 11Th Street (Sta: 116+450) To The 26 Avenue Station (Sta:117+275). It Includes Civil And Structural Works, Including But Not Limitedto Piling, Piers, Approach Slabs And Deck For The Construction Of Theelevated Guideway. The Scope Extends To Earthworks, Utilities, Ductbanks, Cable Containment, Ocs Foundations, Roadworks And Multi-Usepathways, And Construction Management Functions.Further To The Overview The Scope Of Work Comprises But Not Limited To Thefollowing:Priority Package Interface (Blackfoot Trail Lrt Bridge)A) Interfaces With Priority Package - Blackfoot Trail Lrt Bridge Inbetween (Sta Ib 116+060 To 116+160).Site Worksa) Site Preparation, Stripping, Cut/Fill, Stabilization, And Support Ofexcavation As Required To Enable The Construction Of The Works.B) All Final Grading, Associated Landscaping Works And Site Servicing.C) All Temporary Access Roads, Traffic Control Measures And Permanentroadsd) Temporary Servicing, Drainage, Stormwater Management, Anddewatering.E) Removal/Storage/Reinstatement Of City Street Furniture.F) Removal/Relocation Of Any Infrastructure In Conflict With The Works.G) Site Preparation For Transfer To Track Contractor.Civil Works – Elevated Guidewaya) All Elevated Guideway Works Including But Not Limited To, Piling, Piers,Abutments, Wingwalls, Girders, Deck, Barriers, Plinth Pockets, Safetyrailing And Deck Anchorage For Overhead Catenary System (Ocs).B) All Required Elevated Guideway Drainage Infrastructure As Required.C) Drainage Infrastructure And Tie-Ins.D) All Infrastructure Including Anchors And Dowels For Plinths If Requiredto Tie In With The Track Structure.E) All Required Electrical Isolation, Grounding And Bonding Work.F) All Low Voltage Electrical Lighting Fixtures, Conduits And Tie-In.G) All Fire & Life Safety Pipes, Valves & Appurtenances, Testing &Commissioning.Project-Wide Worksa) Design And Implementation Of All Temporary Works.B) Field Review, Monitoring, And Reporting For Temporary Works.C) Support Of Excavation.D) Laydown Areas And Traffic Management.E) Construction Noise And Vibration Mitigation.F) Environmental Mitigation Protection Measures.Interfaces With Other Construction Packagesa) Ramsay/Inglewood Station: Two Stations, Guideway, Utilities Buildings,Mse / Secant Pile Wall, Mups, And Roadworks.B) Communications & Traction Power Systems (Wayside).C) Signaling & Train Control Systems.D) Trackwork Above Sub-Ballast.
|