Iii Build And Dry. 0.5M3 Is Excavated With An Excavator And Loaded Into A Self-Unloading Vehicle, Transportation Of Construction Waste With A Density Of 1.8 T/M3 To A Distance Of 5 Km, Road Repair 5 Km, 3 Gr. Excavating 0.5 M3 Of Rock With An Excavator And Throwing It To The Side Of The Trench, 3 Gr. Manual Rock Processing H<2, B<2, Manual Backfilling Of Trench (Local Soil), 3 Gr. Backfilling Of Rock With A Bulldozer From A Distance Of 5 M, 3 Groups Of Soil Conditioning, Giving A Layer Of Sand, Installation Of A Polyethylene Water Pipe In A Trench Pe100 Sdr11 D500x45.4 Mm Pn16 Drinking Gost 52134-2004, Polyethylene Angle 45˚ D500mm, Pipe For Flange D400mm, Pipe For Flange D450mm, Pipe For Flange D500mm, Polyethylene Triple D500x100mm
Contact Information
Contact Person
Elşad Fərəcov
Address
Bakı ş. AZ1000, Hökümət Evi, mər. 5
Contact No.
+994 12 377 07 70 (601)
Email
elshad.ferecov@rsmx.gov.az
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115463496
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.