Construction Work – Renewal Of Eü Hanfbach. A Partial Demolition Of The Existing Structure Is Planned Up To The Groundwater Level During Construction. The Natural Stone Abutments Of The Existing Building Are Built Up To The Demolition Edge At A Height Of Approx. 65.20 M Above Sea Level. Nhn Removed. The New Double-Track Reinforced Concrete Half-Frame Structure Is Built On A Suitably Thick Layer Of Cleanliness To Level Out The Unevenness, While Maintaining The Clear Width Of The Existing Structure. The Half-Frame Construction Is Deeply Founded On Bored Piles That Are Drilled Through The Existing Abutments. In The Final State, The Existing Abutments Have No Mathematical Bearing Function For Absorbing The Structural Loads; They Merely Serve As Infill. The Future Bridge Structure Will Therefore Not Change In Its Position And Its Clear Dimensions.
Contact Information
Address
Adam-Riese-Straße 11-13
Contact No.
+49 20330174775
Email
Fabian.F.Bruns@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115462078
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.