|
Electrical Fitting Work – Rudolstadt, Heidecksburg Castle; Sip I Project: North And West Wing - Lot 19 Electrical Installation Work. - 1 Pc. Central Battery Emergency Light, 3 Kw, 1 H, - 2 Pc. Fire Damper With Motor Drive (Ventilation Battery Room), - 1 Pc. Small Installation Distribution Box H/W 800/550 Mm, - 1 Pc 2000/1550 Mm, - 1 Piece Of Energy Switchgear Combination, 160A, H/W 950/550 Mm, - 200 Pieces Of Installation Devices (Switches, Sockets), - 270 Pieces Of Device Or Junction Boxes, - 100 M Cable Route Width Up To 300 Mm, - 1000 M Electrical Installation Pipe, Plastic Or Aluminum, Up To 63 Mm, - 4,100 M Halogen-Free Installation Capacity Up To 3X6 Mm2, - 2,450 M Halogen-Free Installation Capacity Up To 5X2.5 Mm2, - 650 M Function Maintenance Cable E30 Up To 3X6 Mm2, - 4100 M Telecommunications Cable Up To 10X2x0.8, Partly E30 - 500 M Fiber Optic Multi-Modem Cable - 130 Pieces. Connection Sleeve Up To 10 Mm2, - 200 Pieces Of Fire Protection Mortar Seal Up To 0.2 M2, - 250 Pieces Of Drilling Holes Through Masonry, D Up To 20Mm, - 600 M Wall Slot In Masonry, W/D Up To 50/30 Mm, - 600 M Wall Slot In Masonry, W/D Up To 150/50 Mm, - 50 Pieces Of Ceiling Floodlights, Led, 27 W, 1,180 Lm, - 20 Pcs. Wet Room Luminaires, 51 W, 6,400 Lm, - 13 Pcs. Escape Sign Lights, - 5 Pcs. Emergency Lights For Areas, - 150 M Led Light Strip For On-Site Stair Handrail, 2000 Lm/M, With Control Unit, - 8 Pcs. Potential Equalization Rails, - 420 M Potential Equalization Line Up To 1X25 Mm2, - 6 Pieces Of Surge Arrester Type 2, - 2 Pieces Of Nra System Stairwell (Motors Provided On Site), - 2 Pieces Of Cable Duct, Plastic, L/W/D 0.8/0.8/1.6 M, - 18 M3 Of Cable Sand, - 150 M Of Underground Cable 5X4 Mm2, - 300 M Of Cable Protection Tube, D Up To 160 Mm, - 6 Pcs. Core Drilling And Front Flange As House Entry Dn150, - 10 Pcs. Snv Distributors (Individual Boxes) Dismantled And Disposed Of, - 500 M Cables Up To D 15 Mm Dismantled And Disposed Of, - 95 Pcs. Switches, Sockets, Device Or Junction Boxes Dismantled And Disposed Of, - 110 Pcs. Disconnect The Final Circuits From The Control Cabinet, Label Them For Reuse, - 80 Hours. Research Existing Cables, Cable Routes.
|