Quotation Are Invited For Complete Replacement Of Existing Damaged Copper Water Supply Network With Ppr Wate ... in United Arab Emirates
Tender Notice
TenderID
115403809
Tender Brief
Quotation Are Invited For Complete Replacement Of Existing Damaged Copper Water Supply Network With Ppr Water Supply Lines Including All Fittings, Etc . Inside Flats Kitchens
Quotation Are Invited For Complete Replacement Of Existing Damaged Copper Water Supply Network With Ppr Water Supply Lines Including All Fittings, Etc . Inside Flats Kitchens Located At Building 2, Japs Family Staff Quarters 1032603112 1 Item-00001 Allow For All Preliminaries And Statutory Approvals (Nocs, Ptw, Lc),Including Sureties, Required Insurances, Transport Of Labor Andt Emporary Materials, Welfare And Messing Facilities, Temporary Works,Utilities, Communications, Medical Services, And Site Clearing O Ncompletion. All Works And Temporary Facilities Shall Comply With Thedubai Municipality Al Sa#Fat # Green Building Regulations, Incl Udingrequirements For Energy-Efficient Temporary Power, Water-Efficiencymeasures, Construction Waste Management, Dust And Noise Cont Rol,Environmental Protection, And The Use Of Compliant Sustainable Materialswhere Applicable. 1 Ls 2 Item-00001 Remove The Corridor Ceilings , Chase The Block Walls And Replace Allexisting Old/Deteriorated Copper Water Supply Network With New 20 No Ppr Watersupply Lines With All Gate Valves , Angle Valves , Joint Fittings ,Elbows , Etc All Associated Fittings And Reinstate The Ceilings Andblock Wall With Similar Wall Tiling With Pressure And Leakage Tests For20 Flats Kitchens As As Per Specification And D Ewas Engineer Approval Complete Replacement Of Existing Damaged Copper Water Supply Network With Ppr Water Supply Lines Including All Fittings, Etc . Inside Flats Kitchens Located At Building 2, Japs Family Staff Quarters . Contact : Venkat / 050 8094992 Site Visit Date <(>&<)> Time : 10,7,26 Payment Terms : 100% On Completion Of Works. Retention Condition ; 5% Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332601641)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115403809
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.