|
Subject: Renovation Of The Sanitary Sewage System 1. Description: The Subject Of The Order Is The Renovation Of The Sanitary Sewage System. The Settlement Of The Subject Of The Order Is A Lump Sum. The Contractor Prepares An Offer Based On The Design Documentation, These Descriptions, Requirements, And Bills Of Quantities. The Contractor, As Part Of The Implementation Of The Subject Of The Order And As Part Of The Offered Remuneration, Is Obliged To Organize, Conduct And Secure The Works In Such A Way As To Ensure Uninterrupted Operation Of The Building During Their Execution And The Possibility Of Ongoing Discharge Of Sewage Into The Combined Sewage System. The Contractor Is Obliged To Predict, Select And Apply All Necessary Organizational, Technical And Technological Solutions Enabling The Continuity Of Operation Of The Sewage System During The Construction. Works, In Particular Temporary Solutions, Bypasses, Pumping, Protection Or Other Measures Necessary To Ensure Proper Sewage Disposal. All Costs Related To Ensuring The Continuity Of The Sewage System, Including The Costs Of Using Temporary Solutions, Devices, Materials, Labor, Security, Arrangements And Possible Additional Works Necessary To Maintain Sewage Disposal During The Implementation Of The Works, The Contractor Is Obliged To Include In The Offer Price. For This Reason, The Contractor Will Not Be Entitled To Additional Remuneration. The Contractor Shall Be Fully Liable For The Consequences Of Carrying Out The Works In A Way That Causes An Interruption, Restriction Or Disruption In The Functioning Of The Sewage System, In Particular For Damage Caused To The Ordering Party, Building Users Or Third Parties. Scope Of Work: - Preparatory Works, - Demolition Of Surfaces And Structures, - Earthworks, - Excavations - Strengthening Of Excavations, - Backfilling, Backfilling, Backfilling. Excavations - Assembly Works, - Sewage Pumping Station, - Reconstruction Of The Surface, - Finishing Works, - Removal Of Demolition Material And Excess Soil. Other Works Resulting From The Bill Of Quantities, Design Documentation And Other Works Necessary To Perform The Task Within The Scope Of The Contractor. A Detailed Description Of The Subject Of The Order Is Included In The Swz, Design Documentation, Bills Of Quantities And Other Documentation Constituting Annexes To The Swz. The Contractor Should Include In The Offer Other Costs Of Works That Are Necessary To Perform The Task. The Ordering Party Allows For The Possibility Of Carrying Out A Site Visit In Order To Become Familiar With The Actual State Of The Construction Site, The Place Of Works, Deliveries And Assembly. An On-Site Visit Can Be Carried Out After Prior Arrangement With The Ordering Party. The Ordering Party Provides For The Possibility Of On-Site Visit From Mon-Fri (On Working Days) From: From 08.30 - 13.00. Before Arrival, You Must Arrange A Visit With An Employee Of The Dps In Klisin: Tel. 77 4857593.2. The Ordering Partys Requirements
|