|
Provision Of Combined Field Office, Laboratory And Living Quarters Building For The Engineer, Project Billboard/Sign Board, Occupacional Safety And Health Program, Mobilization/Demobilization, Clearing And Leveling, Structural Excavation(Hard Rock), Boulder Fill Class C (Stone 60-100Kg), Excavation(Pipe Laying), Backfilling, Well Excavation, Structural Concrete,Top Slab,Manhole Cover,Girder (Class Aa Mix), Catch Basin (Class A Mix) With Removable Concrete Cover And 16Mm Rsb Handle, Reinforce Steel Bar,Grade 60, Reinforce Steel Bar,Grade 40, Formworks And Falsework, Riprap/Slope Protection, Chb Wall With 10 Mm Rsb And Mortar, Plastering, 2 Gate Valve, Overflow(2 G.I Pipe), Outlet To Tank(2 G.I Pipe), Drain Pipe (2G.I. Pipe), Air Vent, 0.50M Wipehole(1 Gi Pipe), 2 Perforated Pvc Pipe, Hdpe Pipe, Pe100, Dn63 (2″), Hdpe Pipe, Pe100, Dn50 (1-1/2″), Compression Straight Coupling 1 1/2, Compression Straight Coupling 2, Coupling Reducer 50X40mm, Tee 2, Pe Valve 40Mm, Pe Valve 50Mm, 900 Elbow 50Mmø, Hdpe Union Patente 2Ø, Clean Out End Cap 2Ø, Rib Type Color Roof 8 (Green) With Tekscrew/J-Bolt And Washers, Prepainted Ridge Roll (Green)(18X8x0.50Mm), Angle Bar 50Mm X 50Mm X 3Mm, C-Purlins 75Mm X 50Mm X 1.0Mm, 4Ø G.I Pipe Sched 40, Galvanized Cyclone Wire(6 Ft X 6M), Gate W/ Padlock And Padlock Slot(1.20M X1.5M), Metal Painting(Grey), Waterproofing, Pebbles, Fine Sand, Activated Charcoal, Geotextile
|