Cooling Towers – The Delivery Of Cooling Towers With A Total Recooling Capacity Of 25 Mw, 2Nd Construction Phase.. The Client Intends To Build The Second Construction Phase Of A District Cooling Center In An Existing Building At The Hkw Süd Site In Order To Supply A District Cooling Network. The Subject Of This Procurement Are Cooling Towers That Ensure The Recooling Of Waste Heat From The Compression And Absorption Refrigeration Machines. The Cooling Towers Should Be Designed As Hybrid Cooling Towers. The Cooling Towers Must Be Designed So That They Can Be Positioned On A Specified Roof Area. The Total Recooling Capacity Is 25 Mw. The Cooling Water Must Be Cooled From 37°C To 27°C. Part Of The Scope Of Delivery And Services Is The Associated Automatic Blow-Down System, Water Conditioning With Biocide Dosage, The Installation Of The Cooling Towers Using A Crane (Including Crane Position), The Cabling Of The Cooling Towers To The Control Cabinets (Including Control Cabinet And Cable Route Construction) And The Execution Of A Suitable Cooling Tower Substructure.
Contact Information
Contact No.
000
Email
schaertl.wolfgang@swm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115083890
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.