|
Quotation are invited for Supply and Replacement of Cooling Tower Damaged Grating Platform Jebel Ali Staff Accommodation Building (A-Block). SUPPLY AND REPLACEMENT OF COOLING TOWER DAMAGED GRATING PLATFORM JEBELALI STAFF ACCOMMODATION BUILDING (A-BLOCK) DEWA-CONFIDENTIAL S UPPLY AND REPLACEMENT OF COOLING TOWER DAMAGED GRATING PLATFORM JEBELALI STAFF ACCOMMODATION BUILDING (A-BLOCK)1. PROJECT OBJECTIVET HE OBJECTIVE OF THIS PROJECT IS TO RESTORE AND ENHANCE THE STRUCTURALINTEGRITY, SAFETY, AND OPERATIONAL RELIABILITY OF THE COOLING T OWERACCESS PLATFORM AND SUPPORTING STRUCTURE AT JEBEL ALI STAFFACCOMMODATION BUILDING (A-BLOCK) THROUGH THE REPLACEMENT OF DETERIORA TEDGRATING, REFURBISHMENT OF STRUCTURAL MEMBERS, STRENGTHENING OFSUPPORTING BEAMS, REPLACEMENT OF CABLE TRAYS, INSTALLATION OF FILTR ATIONUNIT COVERS, AND APPLICATION OF FRP PROTECTIVE SYSTEMS.THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOUR, SUPERVISION, TOOLS,L IFTING EQUIPMENT, TRANSPORTATION, CONSUMABLES, TESTING INSTRUMENTS, ANDANCILLARY ITEMS NECESSARY FOR THE COMPLETE EXECUTION OF THE W ORKS INACCORDANCE WITH THE REQUIREMENTS SPECIFIED HEREIN.THE CONTRACTOR SHALL CONDUCT A DETAILED SITE SURVEY AND VERIFY ALLDIMENSION S, QUANTITIES, AND EXISTING SITE CONDITIONS PRIOR TOCOMMENCEMENT OF WORK. ANY DISCREPANCIES IDENTIFIED DURING THE SITESURVEY SHALL B E BROUGHT TO THE ATTENTION OF THE ENGINEER BEFOREEXECUTION.2. DETAILED SCOPE OF WORK2.1 DISMANTLING, REMOVAL, AND DISPOSAL OF EXISTI NG GRATING SYSTEMTHE CONTRACTOR SHALL CAREFULLY DISMANTLE AND REMOVE THE EXISTING DAMAGEDGRATING PLATFORM, INCLUDING ALL ASSOCIATED SUPPORT MEMBERS, FIXINGCLIPS, BRACKETS, FASTENERS, AND ACCESSORIES THAT ARE NO LONGER SUITABLEFOR SERVICE.THE SCOPE SHALL INCLUDE:## REMOVAL OF ALL DAMAGED MS GRATING PANELS AROUND THE COOLING TOWERSPLATFORM.##DISMANTLING OF DETERIORATED SUPPORT CHANNELS AND ANCILL ARY COMPONENTSIDENTIFIED BY THE ENGINEER.DEWA-CONFIDENTIAL##PROTECTION OF EXISTING COOLING TOWERS EQUIPMENT, PIPING, VALVES,INSTRUME NTATION, ELECTRICAL CABLES, AND ASSOCIATED SERVICES DURINGDISMANTLING ACTIVITIES.##COLLECTION, SEGREGATION, LOADING, TRANSPORTATION, AND DISPOSAL OF ALLREMOVED MATERIALS.ALL DISMANTLED GRATING MATERIALS AND SCRAP STEEL COMPONENTS SHALL BETRANSPORTED AND HANDED OVE R TO DEWA RUWAIYAH SCRAP YARD.THE CONTRACTOR SHALL ARRANGE ALL NECESSARY:##VEHICLES AND TRANSPORTATION.##CRANE OR LIFTING EQUIPMENT. ##LOADING AND UNLOADING ACTIVITIES.##MANPOWER AND SUPERVISION.##ENTRY PERMITS AND GATE PASSES.##SCRAP DISPOSAL DOCUMENTATION.UPON CO MPLETION, THE CONTRACTOR SHALL SUBMIT OFFICIAL SCRAP DISPOSALRECORDS AND ACKNOWLEDGMENT RECEIPTS ISSUED BY DEWA.2.2 SUPPLY, FABRICAT ION, AND INSTALLATION OF NEW PULTRUDED FRP GRATINGTHE CONTRACTOR SHALL DESIGN, SUPPLY, FABRICATE, AND INSTALL A COMPLETENEW HEAVY-DU TY PULTRUDED FRP GRATING PLATFORM SYSTEM TO REPLACE THEEXISTING DAMAGED GRATING.THE GRATING SYSTEM SHALL BE SUITABLE FOR CONTINUOUS OPERATION IN ACOOLING TOWER ENVIRONMENT AND RESISTANT TO MOISTURE, CHEMICALS, UVEXPOSURE, AND CORROSION.THE SCOPE SHALL INCLUDE:##DE TAILED SITE MEASUREMENT AND FABRICATION DRAWINGS. SUPPLY OF HEAVY-DUTY PULTRUDED FRP GRATING PANELS.##FABRICATION OF GRATING SECTIO NS TO SUIT SITE CONDITIONS.DEWA-CONFIDENTIAL#PROVISION OF ALL REQUIRED CUT-OUTS, NOTCHES, AND OPENINGS FOR: PIPEPENETRATIONS.#STRUCT URAL MEMBERS.#CABLE ROUTES.#MAINTENANCE ACCESS REQUIREMENTS.##SUPPLY AND INSTALLATION OF EDGE BANDING AND REINFORCEMENT MEMBERS.#SUP PLY AND INSTALLATION OF SS316 FIXING CLIPS, HOLD-DOWN CLAMPS,FASTENERS, AND ACCESSORIES.#INSTALLATION AND ALIGNMENT OF GRATING PANEL S TO ENSURE A SAFE ANDLEVEL WALKING SURFACE.MINIMUM TECHNICAL REQUIREMENTS DESCRIPTION #REQUIREMENT #TYPE #PULTRUDED FRP GRATING #TH ICKNESS #MINIMUM 38 MM #SURFACE FINISH #ANTI-SLIP GRITTED SURFACE #RESIN SYSTEM #ISOPHTHALIC POLYESTER OR VINYL ESTER #UV PROTECTION #REQUIRED #FIRE RETARDANCY #ASTM E84 CLASS 1 OR EQUIVALENT REQUIRED #CORROSION RESISTANCE #SUITABLE FOR COOLING TOWER ENVIRONMENT # COLOUR #GREY OR APPROVED EQUIVALENT #FASTENERS #SS316 STAINLESS STEEL #2.3 REMOVAL AND REPLACEMENT OF EXISTING STRUCTURAL SUPPORT ME MBERSTHE CONTRACTOR SHALL CARRY OUT A DETAILED INSPECTION OF THE SUPPORTINGSTEEL FRAMEWORK BENEATH THE COOLING TOWER PLATFORM.ALL DA MAGED, CORRODED, DEFORMED, OR STRUCTURALLY WEAKENED STEEL MEMBERSSHALL BE REMOVED AND REPLACED. DEWA-CONFIDENTIALTHE SCOPE SHALL INC LUDE:##REMOVAL AND DISPOSAL OF DAMAGED MS HORIZONTAL AND VERTICAL SUPPORTMEMBERS.##FABRICATION AND INSTALLATION OF NEW STRUCTURAL ST EEL SUPPORTS.##SUPPLY AND INSTALLATION OF STEEL CHANNELS, ANGLES, PLATES, BRACKETS,AND STIFFENERS AS REQUIRED. Qty: 1 Supply and Replacement of Cooling Tower Damaged Grating Platform Jebel Ali Staff Accommodation Building (A-Block) Contact : Mohideen / 553810513 Site Visit Date & Time: 01/07/2026 Payment Terms: 95% After completion of works Retention Condition:5% STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601563)/$value
|