|
1. The Subject Of The Order Must Be Performed In Accordance With The Attached Bill Of Quantities, Swz And Technical Specification. The Order Includes The Following Works: • Tearing Off Pvc Floor Coverings, • Cutting Out Loose Surfaces Under The Carpets (Cement Floor), • Cutting Out Concrete Floor Plinths, • Dismantling The Board Mounted On Metal Brackets, • Cutting Out Ventilation Grids From The Inactive Walls And Dismantling The Wooden Platform, • Dismantling Wooden Door Frames, • Cutting Out Door Openings In Brick Walls, • Construction Of Door Recesses With Plasterboards, • Construction Of Partition Walls From Plasterboards And Filling The Walls With Mineral Wool - Regarding The Division Of Two Teaching Rooms; 334 And 335, • Electrical Works (Adaptation Of Lighting Installations And Electrical Sockets) Related To The Division Of Rooms 334 And 335 Into Smaller Ones, • Filling Of Plaster Defects On The Walls (Including Plinths), • Plastering Of Selected Walls, • Installation Of Aluminum Corners On The Edges Of The Walls, • Painting Of Walls And Ceilings Along With Priming The Substrate, • Installation Of Valves On The Supply And Return Of Radiators - Regarding Central Heating Installations, • Painting Radiators, Central Heating Pipes, Window Sills, Fanlights, Plinths With Oil Paint, • Grinding, Polishing And Polishing Terrazzo Floors (Auditorium Platform Made Of Terrazzo), • Scraping Emulsion Paint From The Surface Of Wooden Sidelights Above The Entrances To Rooms, • Finishing Works Of Walls Around New Door Frames After Replacing Doors, • Installation Of Lighting Fixtures In The Room 338,• Installation Of A Self-Leveling Leveling Layer For The Carpet,• Preparation Of The Subfloor For A New Homogeneous Pvc Floor Covering,• Laying The Carpet With The Fold-Over On The Walls,• Installation Of Threshold Strips,• Removal And Disposal Of Debris And Torn Carpets.2. Order Completion Date: Up To 15 Weeks (105 Days) From The Date Of Conclusion Of The Contract, Provided That The Renovation Of At Least Six Classrooms (Indicated By The Ordering Party) Must Be Completed By September 30, 2026. After The Start Of The 2026/2027 Academic Year, I.E. From October 1, 2026, A Maximum Of Two Classrooms May Be Closed At The Same Time.
|