|
1. The Subject Of The Order Is The Implementation Of Construction Works On The Investment Task Titled: Construction Of A Sanitary Sewage System For The Town Of Czarniecka Góra - Stage 2.2. The Investment Is Aimed At Sewerage In A Rural Area - The Town Of Czarniecka Góra (Stage 2).3. The Subject Of The Order Is The Implementation Of A Task Consisting In The Construction Of A Gravity-Pressure Sanitary Sewage System With Sewage Pumping Stations P3 And A Household Pumping Station Ppd 1, Together With Electrical Installations Supplying The Pumping Stations And Connecting The Network To The Existing One Built In Stage 1. Network Outlets (83 Pcs.) With Plugs Will Be Made To The Boundaries Of Private Plots. Sewage Lines Will Be Laid In Open Trenches And By Drilling/Jacking In Pipes Or Without Protective Pipes. The Works Will Be Carried Out In Accordance With The Building Permit Decision No. Bp.6740.87.2024.Ik Of July 11, 2024. The Scope Of The Entire Investment Project Includes The Construction Of A Section Of The Gravity-Pressure Sewage Network (To Be Implemented On Plots With Registration Numbers 52/2, 135/1200, 155, 156, 176, 178/1, 180, 181, 182, 197, 199, 222, 224/1, 225, 232, 238, 245/1, 245/2, 246/1, 246/2, 247, 255, 262, 325/1, 434/1, 434/3, 434/7, 434/8, 434/10, 438/1, 438/2, 438/4, 438/5, 438/6, 438/7, 452/1, 452/2, 452/4, 452/9, 486/1, 486/3, 486/4, 486/5, 486/9, 487/7, 487/8, 487/9, 487/10, 487/12, 561/6, 561/8, 583, Registry District 0007 Czarniecka Góra And On Plots With Registration Numbers 81/7, 81/1201, Registry District 0004 Błotnica), I.E.: P3-Cz1-Cz38, Cz4-Cz4.7, Cz10-Cz10.4, Cz16-Cz16.5, Cz21-Cz21.6, Cz24-Cz24.6, Cz25-Cz25.4, Cz29-Cz29.7, Cz34-Cz34.7, P3-Cz1-R43, R14-R14.2, R21-R21.4, P3-Cn1-Cn35-Pozp.P3-Z16, Z22-Zd1-Zd9, Z29-Z38-Z47, Z38-Z38.3-Ppd1, Z38.3-Z38.6, And As Part Of It, The Construction Of: - Gravity Channels With A Total Length Of L = 3,480.85 M In The Range Of Diameters: - Pvc Sn8 Dn 200 Mm With A Length Of L = 1,929.39 M, - Pe Rc Dn 200 Mm With A Length Of L = 1,551.46 M, - Pressure Channels With A Total Length Of L = 803.43 M In The Diameter Range: - Pe Rc Dn 90 Mm With A Length Of L = 591.30 M, - Pe Dn 90 Mm With A Length Of L = 159.76 M, - Pe Dn 63 Mm, Length L = 52.37 M - Pvc Drains Sn8 Dn 160 Mm, Length L = 495.12 M - Inspection Chambers Dn 1200 Mm Made Of Concrete Elements - 74 Pieces, Including Cascade - 15 Pieces - Expansion Chambers Dn 625 Mm - 1 Piece - Inspection Chambers Dn 600 Mm - 40 Pieces - Inspection Chambers Dn 1200 Mm On The Discharge Channel - 1 Pc. - Plastic Well, Diameter Dn 400-425 Mm - 7 Pcs. - Tees 200/160 - 44 Pcs. - P3 Sewage Pumping Station Located On The Plot With Registration Number 81/1201, Błotnica District, With An Energy Connection To Power The Sewage Pumping Station, With A Power Supply And Control Cabinet And Land Development Pumping Station, Including A Manual Crane - P3: D=1.5 M, H=4.3 M, Number Of Pumps: 2 Sets, Efficiency: 4.0 L/S, Lifting Height 18.8 Msw, - Household Pumping Sta
|