|
1. The Subject Of The Order Is The Renovation Of The Building Of The Municipal Office In Głuchołazy As Part Of The Task Called: Renovation Of The Building Of The Municipal Office In Głuchołazy Under The European Union Solidarity Fund.2. The Works Should Be Performed In Accordance With The Developed Technical Documentation Entitled: Renovation Of Office Rooms On The Ground Floor And The Boiler Room In The Building Of The Municipal Office In Głuchołazy Damaged By Flood, Technical Specifications For The Execution And Acceptance Of Construction Works, Bills Of Quantities And Applicable Regulations, Principles Of Technical Knowledge And Construction Practice3. The Detailed Scope Of The Subject Of The Order Includes, Among Others: 1) Demolition Works, 2) Removal Of Internal Plasters, 3) Replacement And Installation Of Doors, 4) Removal Of Mold From Walls, Fluting Surfaces, Priming, Plastering, Painting, 5) Repair And Installation Of Electrical Installations, Disassembly And Installation Of Fixtures, Sockets And Connectors, 6) Repair Of Central Heating Installations, Disassembly And Installation Of Radiators, 7) Replacement Of Windows, 8) Dismantling The Wall Covering Made Of Tiles,9) Taking Out And Bringing In The Equipment,10) Construction Of The Approach And Installation Of Instantaneous Water Heaters,11) Installation Of The Washbasin, Sinks And Washbasin Faucets,12) Installation Of Brackets For The Disabled,13) Installation Of Air Curtains,14) Delivery And Installation Of The Flood Barrier,15) Laying Tiles And Facing The Walls With Tiles Stoneware,17) Arrangement Of Telecommunications Cables,18) Construction Of A Floor Made Of Plastic Carpets With A Roll Insulation Layer,19) Delivery And Installation Of Equipment,20) Delivery And Installation Of A Barrier For Disabled People. The Detailed Scope Of Works Is Included In Annex No. 1 To The Swz - Technical Documentation4. Note: The Ordering Party Informs That The Renovation Will Be Carried Out In Rooms No. 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 And The Basement Rooms. The Remaining Scope In Rooms 1, 2 And 3 Has Been Completed.
|