|
The Subject Of The Order Is The Performance Of Construction Works Consisting Of, Among Others: On The Expansion With A Superstructure And Reconstruction Of The Social And Administrative Building Of The Forest Transport Center Along With Technical Infrastructure And Land Development On Part Of The Plot And Obtaining A Final Or Immediately Enforceable Occupancy Decision For The Entire Subject Of The Order. Name Of The Investment Task In The Ordering Partys System: Reconstruction, Modern. Of The Social-Adm Building. 104/51. Category Of The Building: Xvi. Construction Works On The Existing Building Include In Particular: 1) Demolition: A) On The Basement Level: Dismantling Windows And Doors, Widening The Passage, Opening The Ceiling Above The Basement, Demolition Of Partition Walls, B) On The Ground Floor: Demolition Of Internal Partitions, Installations, Finishing Materials, Joinery And Other Building Elements, Opening The Ceiling Above The Basement In The Designed Place Descent, C) At The Level Of The Second Floor: Demolition Of Walls, Roof, Demolition Of Installation Elements, Finishing Materials, Joinery And Other Building Elements, D) Demolition Of The Chimney; 2) Construction Works: A) At The Basement Level: Bricking Up Old Openings (Frames, Chutes, Holes In Partition Walls), Construction Of A Descent From The Ground Floor, Construction Of New Partition Walls, Installation Of New Joinery Together With The Installation Of Light Wells, Leveling Floors, Insulating The Ceiling With Hard Thermal Insulation, Making Gravity Ventilation, Plastering And Painting, B) On The Ground Floor: Bricking Up Old Holes After Dismantling The Joinery, Widening The Passage, Making A Descent From The Ground Floor To The Basement, Building New Partition Walls, Installing New Joinery, Making A Suspended Ceiling, Leveling The Floor With Insulation, Making A Porch With A Roof, Plastering And Painting, C) At The Level Of The Second Floor: Construction Of A New Flat Roof In A Light Structure On Steel Beams, Covered With Trapezoidal Galvanized Sheets Along With Insulation, Construction Of New Load-Bearing Walls And Partition Walls, Construction Of A Wreath, Construction Of A Suspended Ceiling, Installation Of New Joinery, D) Staircase: Construction Of A Glazed Partition On Aluminum Profiles, Construction Of New Load-Bearing Walls And Partition Walls, Construction Ring Beam, Construction Of A Suspended Ceiling, Installation Of New Joinery, Plastering And Painting, E) Construction Of A Ramp For Disabled People, F) Performance Of Landscaping To The Extent Indicated In The Documentation, G) Insulation Of External Above-Ground Walls With Pressed Mineral Wool Along With Structure And Painting, H) Construction Of A Band, I) Insulation Of Foundation Walls With Mineral Wool Boards Along With Waterproofing, J) Installation Of Sheet Metal Flashings, Gutters, Downpipes And Window Sills. Additionally, As Part Of The Subject Of The Order, The Contractor Will Be Obliged To Perform Internal
|