|
1. Construction Of A New Road Connection Of The Dr. J. Jonston Provincial Multi-Specialized Hospital With E.Estkowski Street (Dk12) Along With The Reconstruction Of Szpitalna Street In Leszno, In Accordance With The Scope And Provisions Resulting From This Swz Together With Its Annexes. Note! The Ordering Party Does Not Allow The Submission Of Partial Offers.2. Designation Of The Subject Of The Order According To The Common Procurement Dictionary Cpv: 45233140-2 - Road Works, 71500000-3 - Construction-Related Services; 45230000-8 Construction Works In The Field Of Construction Of Pipelines, Communication And Power Lines, Highways, Roads, Airports And Railways; Land Leveling,45231400-9 Construction Works In The Field Of Construction Of Power Lines,45233000-9 Construction Works In The Field Of Construction, Foundations And Surfaces Of Highways, Roads,45111200-0 Works In The Scope Of Preparing The Site For Construction And Earthworks, 45332000-3 Water And Sewage Installation Works,45231220-3 Construction Works In The Field Gas Pipelines, 45233200-1 Various Surface Works, 45233220-7 Road Surface Works, 45233290-8 Installation Of Road Signs, 45316110-9 Installation Of Road Lighting Devices.3. The Scope Of The Order Includes, Among Others: A) Demolition Works Of The Existing Surface And Vertical Markings, B) Construction Of A Trough For The Road Surface Structure, C) Installation Of Concrete Retainers, Edges And Curbs On A Footing With Resistance, D) Construction Of A Sewage System From Concrete Cubes On A Concrete Footing, E) Profiling And Compaction Of The Subgrade, F) Construction Of A Road Surface For Pedestrians And Bicycles From Non-Beveled Concrete Cubes, G) Construction Of A Road Surface For Pedestrians Made Of Concrete Cubes Without Chamfers, H) Construction Of A Surface From A Mineral-Asphalt Mixture, I) Installation Of Street Lighting Lamps, J) Reconstruction Of Conflicting Networks, K) Construction Of Cable Ducts, L) Construction Of A Storm Sewage Collector, M) Purchase And Installation Of Storm Sewer Inlets, N) Felling Of Trees And Grubbing Up, O) Planting Greenery, P) Construction Of Vertical And Horizontal Markings, Q) Construction Of A Wall Retaining Wall, R) Construction Of A New Fence And Gates.
|