|
Tender for Fitting-Fixing Of Equipments, Repairing Of Existing Drinking Water Arrangements And Operation & Maintenace Work Of Water Supply Schemes In Darshaniyatikar, Maa Tara Mandir And Hansdiha During Shrawani Mela-2026. , Earth Work In Excavation (As Per I.S. 3114) 1965 For Laying Of Different Type And Sizes Of Pipe So As To Give One Meter Average Cover Over The Socket Of Pipe With Disposal Of Excavated Earth Within Initial Lead And Left As Per Specification & Direction E/I. Upvc .Pipe 40Mm 90% Of Total (As Per Soil Item Class A) , 10% Of Total (As Per Soil Item Class B) , Providing Coarse Clean Sand In Filling In Foundation Trenches And In Plinth Including Ramming And Watering In Layers Not Exceeding 150Mm Thick With All Lead And Lift Including Cost Of Materials Labours Royalty And Taxes All Complete As Per Building Specification And Direction. 10% Of Excaveted Earth. I) Upvc .Pipe 40Mm , Earth Work In Back Filling In The Trenches After Laying Different Sizes Of Pipe With Earth Removed During Excavation Lead & Left As Per Specification & Direction Of E/I. , Suppling Upvc Pipe With Labours And Tool For Laying And Jointing U.P.V.C Pipe In Trenches And Making Joints With U.P.V.C Collar And Solvent Cement All Complete As Per Specification And Direction Of E/I. (I) 40 Mm Dia , Prviding And Fixing Ball Valve Of Approved Quality All Compelte As Per Specification And Directions. I.40 Mm Dia Upvc , Supplying Labour And Tools For Laying And Jointing U.P.V.C Specials In Trenches As Per Specification And Direction Of E/I. I. Tee -40 Mm Dia Upvc , Ii. Plain Coupler-40 Mm Dia Upvc , Iii. Elbow - 40 Mm. Dia Upvc , Iv. Reducer Tee-40X32 Mm Dia. Upvc , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Stacking Etc. All Complete As Per Building Specification And Direction Of E/I (05%) (Ls) , Supply/Fixing Of Water Storage Tank Fittings-Upvc In Place Of Damaged Upvc Fittings I. Union - 50 Mm. Dia Upvc , Ii.Tank Connector-50 Mm Dia Upvc , Iii. Tee-50 Dia. Upvc , Iv. 50 Mm Dia Ball Valve Upvc , V. 50 Mm Dia Upvc Pipe , Vi.Elbow - 50 Mm. Dia Upvc , Vii. Plain Coupler-50 Mm Dia Upvc , Viii. 32 Mm Dia Upvc Pipe , Ix. Elbow - 32 Mm. Dia Upvc , X. Plain Coupler-32Mm Dia Upvc , Xi. 32 Mm Dia Ball Valve Upvc , Cost Towards Supplying Labour Tools, Tackles ,Materials And Pvc Solvet Etc. For And Fitting And Fixing Of-2000 Ltrs Capacity Isi Water Storage Tank (05Nos.) With Transportation Charge. , Cost Towards Supplying Labour Tools, Tackles Etc. For Lowering And Fitting Of 02 Hp, 03 Hp & 03Hp Submersible Pump Set With Column Pipe All Complete Job. , Cost Towards Supplying Labour Tools, Tackles Etc. For Lifting And Taking Out Of 02 Hp, 03Hp & 03 Hp Submersible Pump Set With Column Pipe,Disconnection Of Hdpe Tank From Platform,Tap And Nipple From Stand Post And Transportation Charge Etc. All Complete Job. , Providing plain cement concrete M100 (1:3:6) In Foundation With Approved Quality Of Stone Metal Grade Iii (53Mm To 22.4Mm Size) Clean Coarse Sand Of F.M (2.5 To 3) Including Screening Mixing Cement Concrete In Mixer And Placing In Position Vibration, Curing Taxes & Royalty All Complete As Per Building Specification And Direction Of E/I. , Providing Designation 75 B Brick Work In Cm.(1:6) In Superstructure With Approved Quality Of Clean Coarse Sand Of F.M(2 To 2.5) Incluing Providing 10 Mm Thick Mortar Materials Joint Cost Of Screening Scaffolding Racking Out Joint To 15 Mm Depth,Curing Taxes Of Royalty All Complete As Per Building Specifiaction And Direction Of E/I. , Providing 12Mm Cement Plaster (1:6) With Approved Quality Of Clean Coarse Sand Of F.M 1.5 Including Screening Curing With All Leads & Lift Of Water Scaffolding Taxes & Royalty All Complete As Per Building Specification And Direction Of E/I. , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Staking Etc. All Complete As Per Building Specification And Direction Of E/I 5% (Ls) , Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Over Old Surface Including Washing,Cleaning And Preparing The Walls ,Scafolding ,Washing Of Floor And Taxes All Complete As Per Building Specification And Direction Of E/I. , Supplying Materials,Fitting & Fixing Of Approved Make All Complete As Per Direction Of E/I. A) 15Mm.Dia. G.I. Socket , B)15 Mm Dia G.I. Nipple , C) 15 Mm Dia Ci Push Cock(Weight Not Less Than 400Gms) , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Staking Etc. All Complete As Per Building Specification And Direction Of E/I 5% (Ls) , Cost Of Clean Of Place Nearby Standpost Including Removing Of Grass, Useless Shrubs Etc.Complete Job. (For 18 Nos. Stand Post) , Providing And Laying 6Mm Precast White Glazed Tiles In Wall Over 12Mm Cement (1:3) And Joint With Grey Cement Slurry Flush Point With Cement Including Rubbing Polishing And Cost Of Curing. , Providing, Fitting And Fixing Hci Or Ms Grating Weight Not Less Than 1.25 Kg At The Inlet Of The Soak Pit , Supplying All Materials, Labours, Tools, Tackles And Constructing Brick Masonry Drain 150 Mm Wide And 150 Mm Deep With 250 Mm Apron On Both Sides Over 50 Mm Thick Plain Cement Concrete M15 (1:3:6) Over A Brick Flat Soling 12 Mm Cm(1:3) With Punning On Exposed Surfaces All Complete Job As Per Specification & Direction Of E/I. , Carriage Of Construction Materials From Their Source To The Construction Site Including Cost Of Loading, Transporting, Unloding And Stacking In Countable Stacks Including 10% Cp & 5% Ohc All Complete As Per Specifications And Direction Of The E/I.10% Of The Sub Total , Providing Two Coats Of Snowcem Of Approved Shade And Make Over Old Surface Including Washing,Cleaning And Preparing The Plastered Surface Smooth With Sand Paper, Scaffolding, Curing And Taxes All Complete As Per Building Specification And Direction Of E/I. , Providing Two Coats Of Painting With Ready Mixed Paint Approved Shade And Make Over Steel Surface Including Cleaning The Surface Thoroughly Scaffolding And Taxes All Complete As Per Building Specification And Direction Of E/I. Door , Window , Transportation Charge Of Submersible P/Set, Column Pipe Etc. From Store Basukinath Wtp Campus To Site And Vice Versa. , Cost Towards Supplying Labour Tools And Tackles Etc. For Lowering And Fitting Of 1.5 Hp Submersible Pump Set With Column Pipe In Hydt And Lifting Of P/Set With All Accessories After Completion Of Mela All Complete Job. , Providing plain cement concrete M100 (1:3:6) In Foundation With Approved Quality Of Stone Metal Grade Iii (53Mm To 22.4Mm Size) Clean Coarse Sand Of F.M (2.5 To 3) Including Screening Mixing Cement Concrete In Mixer And Placing In Position Vibration, Curing Taxes & Royalty All Complete As Per Building Specification And Direction Of E/I. , Providing 12Mm Cement Plaster (1:6) With Approved Quality Of Clean Coarse Sand Of F.M 1.5 Including Screening Curing With All Leads & Lift Of Water Scaffolding Taxes & Royalty All Complete As Per Building Specification And Direction Of E/I. , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Staking Etc. All Complete As Per Building Specification And Direction Of E/I 5% (Ls). , Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Over Old Surface Including Washing,Cleaning And Preparing The Walls ,Scafolding ,Washing Of Floor And Taxes All Complete As Per Building Specification And Direction Of E/I. , Supplying Materials,Fitting & Fixing Of Approved Make All Complete As Per Direction Of E/I.. E)15Mm.Dia. G.I. Socket. , F)15 Mm Dia G.I. Nipple , G)15 Mm Dia Ci Push Cock(Weight Not Less Than 400Gms) , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Staking Etc. All Complete As Per Building Specification And Direction Of E/I 5% (Ls) . , Cost Of Clean Of Place Nearby Standpost Including Removing Of Grass, Useless Shrubs Etc.Complete Job. , Providing plain cement concrete M100 (1:3:6) In Foundation With Approved Quality Of Stone Metal Grade Iii (53Mm To 22.4Mm Size) Clean Coarse Sand Of F.M (2.5 To 3) Including Screening Mixing Cement Concrete In Mixer And Placing In Position Vibration, Curing Taxes & Royalty All Complete As Per Building Specification And Direction Of E/I. , Providing 12Mm Cement Plaster (1:6) With Approved Quality Of Clean Coarse Sand Of F.M 1.5 Including Screening Curing With All Leads & Lift Of Water Scaffolding Taxes & Royalty All Complete As Per Building Specification And Direction Of E/I. , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Staking Etc. All Complete As Per Building Specification And Direction Of E/I 5% (Ls). , Providing One Coat Of Plastic Emulsion Paint Of Approved Shade And Make Over Over Old Surface Including Washing,Cleaning And Preparing The Walls ,Scafolding ,Washing Of Floor And Taxes All Complete As Per Building Specification And Direction Of E/I. , Supplying Materials,Fitting & Fixing Of Approved Make All Complete As Per Direction Of E/I. E)15Mm.Dia. G.I. Socket , F)15 Mm Dia G.I. Nipple , G)15 Mm Dia Ci Push Cock(Weight Not Less Than 400Gms) , Carriage Of Following Materials To Work Site (Avg Lead) Including Loading Unloading And Staking Etc. All Complete As Per Building Specification And Direction Of E/I 5% (Ls) , Cost Of Clean Of Place Nearby Standpost Including Removing Of Grass, Useless Shrubs Etc.Complete Job. , Cost Towards Supplying Labour Tools And Tackles Etc. For Lowering And Fitting Of 1.5 Hp Submersible Pump Set With Column Pipe In Hydt And Lifting Of P/Set With All Accessories After Completion Of Mela All Complete Job. , Transportation Charge Of Submersible P/Set, Column Pipe Etc. From Store Basukinath Wtp Campus To Site And Vice Versa. , Pump Operator Grade-Ii For P/Plant- Darshiniyantikar & Ma Tara Mandir For 45 Days X 6 Nos. (3 Shifts X 2) = 270 Days. , Contractor Profit @10% , Energy Cost For 45 Days During Mela.-(2.00 H.P.+3.00 Hp. + 3.00 Hp.)=5.968 Kw X1.5Months =8.95Kw @ 9900/Kw , Energy Cost For 45 Days During Mela.-(1.5H.P. + 1.5H.P.)= 2.24Kw X1.5Months =3.357Kw @ 9900/Kw (Hansdiha&Maa Tara Mandir) , 18% Gst , 1% Labour Cess
|