|
Overhead Line Construction - Implementation Of The Construction Of The V492 Veľký Ďur - Horná Ždaňa Line To R400kv In Est Levice. 1. The Subject Of The Contract Is The Construction Of The Work: The Opening Of The Line V492 Veľký Ďur - Horná Ždaňa To R400kv In Est Levice, Consisting Of Seven Construction Objects: So 01 The Opening Of The Line 2X400 Kv V490/491 In A Length Of 1,265 Km So 02 The Change Of Part Of The Line 1X400 Kv V490 To Line V449 In Length 2.5 Km So 03 Opening Of Line 2X400 Kv V492/426 In Length 2.014 Km So 04 New Line V492 In Length 2.173 Km So 05 Storage Optical Cable (Úok) Field No. 5 So 06 Storage Optical Cable (Úok) Field No. 7 So 07 Storage Optical Cable (Úok) Field No. 8 The Scope Of The Performance Is The Dismantling Of The Existing Parts Of The Line V491 In The Section P.B.No.48 - Portal Est Levice, V492 In The Section P.B.No.48 - P.B.No.61, V426 In The Section P.B.No.8 - Portal Est Levice, V449 In The Section P.B.No.50 - Portal Est Levice And V490 In Section P.B.No.35 – Portal Est Levice, Construction Of Part Of New Lines V490/V491 In Section P.B.No.48 – Portal Est Levice, Part Of New Lines V492/V426 In Section P.B.No.8 – Portal Est Levice, Part Of New Line V492 In Section P.B.No.50 – P.B.No.4 (Common Support Point For Lines V492/426) And Part Of The New Line V449 In The Section P.B.No.37 – P.B.No.48 As Well As The Construction Of New Storage Optical Cables (Úok) In Est Levice (Field No. 5, Field No. 7 And Field No. 8), Related Activities, Development Of Documentation For The Implementation Of The Construction (Drs), Workshop Documentation Of The Masts And Documentation Of The Actual Execution (Dsv) In The Sense Of The Developed Documentation For The Selection Of The Construction Contractor (Dvz) The Connection Of The Line V492 Veľký Ďur – Horná Ždaňa To R400kv In Est Levice, Arch. Number 52-9-02519 Prepared By The Company Spie Elektrovod, A.S., Prievozská 4C, 824 66 Bratislava Dated 02/2026. 2. Assembly Work Within The Construction Of New Parts Of The 400 Kv Line, As Well As Dismantling Work On The Original 400 Kv Line, Will Take Place With Regard To The Dates Of The Shutdown Of Lines V491, V492, V426, V449 And V490 In 2028, In The Expected Total Extent Of The Shutdown Of The V491 Line For 59 Days (From 21.08.2028 To 19.10.2028), Line V492 For 14 Days (From 14.10.2028 To 24.10.2028 And From 11.12.2028 To 15.12.2028), Line V426 For 115 Days (From 22.08.2028 To 15.12.2028), Line V449 For 46 Days (From 25.10.2028 To 10.12.2028) And V490 For 51 Days (From 20.10.2028 To 10.12.2028), Continuously In Accordance With The Approved Construction Schedule Drawn Up By The Construction Contractor. Assembly Work As Part Of The Construction Of New 400 Kv Lines Will Be Carried Out Continuously On 1X400 Kv Lines V491, V492, V426, V449 And V490 In The Switched Off State. The Exact Dates Of Turning Off Lines V491, V492, V426, V449 And V490 Will Be Determined In The Annual Schedule For Turning Off The Lines And Notified In Writing To The Contractor. The Mentioned Dates For Switching Off Lines Can Be Changed In The Event Of An Unfavorable Situation In The Transmission System Exclusively By The Customer Based On His Requirements And/Or The Occurrence Of Circumstances Justifying The Conclusion Of An Addendum According To § 18 Zvo, While When Changing Them, The Contractor Is Obliged To Take Into Account The Annual Shutdown Plan. In The Event Of A Change In The Dates Of Disconnection Of The Line, The New Dates Of Disconnection Of The Line Will Be I
|