Painting Work Of Buildings – Ve 67.5 - Painting Work On Levels 2 And 3, Complete Renovation Of Potsdam Town Hall, 14469 Potsdam. Ve 67.5 Painting Work Level 2 And 3: Securing: Approx. 1,300 M2 Components Protect Approx. 4,800 M2 Cover Floor Areas Approx. 600 Pieces Cover Radiators Demolition Painter: Approx. 5,800 M2 Remove Dowels, Wooden Blocks, Nails And Hooks Preparatory Work: Approx. 5,850 M2 Close Dowel Holes Approx. 14,300 M2 Existing Coating Sand The Inside Of The Walls Approx. 4,500 M2 Remove Old Coating Approx. 400 M2 Old Coating Remove Oil Approx. 400 M2 Existing Coating Remove Ceilings Substrate Preparation: Approx. 18,000 M2 Of Plastered Areas Q3 Fill Approx. 6,900 M2 Of Plastered Areas Partially Fill Approx. 2,500 M Of Reveals Fill Approx. 7,900 M2 Of Ceiling Area And Joists Approx. 4,000 M2 Of Primer, Walls, Drywall, Approx. 1,800 M2 Of Primer, Ceilings And Ceiling Cases, Drywall, Approx. 20,000 M2 Of Primer, Wall Area, Plaster, Approx. 2,500 M Of Primer, Reveal, Plaster, Approx Stucco Moldings Approx. 600 M2 Insulating Paint Walls Approx. 400 M2 Insulating Paint Ceilings Wallpapering Painter: Approx. 400 M2 Painters Fleece Drywall Walls Approx. 1,300 M2 Painters Fleece Plastering Surfaces Walls Approx. 1,000 M2 Painters Fleece Ceilings Plaster Coating: Approx Drywall Approx. 22,000 M2 Coating Walls Plaster Approx. 2,500 M Coating Reveals Approx. 6,700 M2 Coating Ceilings Plaster Approx. 4,000 M Coating Ceiling Valley Approx. 2,000 M2 Additional Medium Tint Approx. 2,000 M2 Additional Rich Tint Approx. 2,600 M Coating Heating Pipes Approx. 300 Pieces Coating Cast Ribs Radiator Approx. 14,500 M Acrylic Approx. 5,300 M Coating Skirting Boards
|