Substation Construction Work – Duvi 132/11 Kv Substation, Establishment Of Cable Line. The Tenderer Orders The Performance Of The Following Tasks From The Winning Tenderer Based On The Content Of The Submitted Plans, Permits And Technical Documents: • Architectural And Electrical Technological Construction Of The Transformer Substation Within The Scope Of Construction Of The Duvi 132/11 Kv Substation, Cable Line • Splitting Of The 132 Kv Cable On The Main Distribution Network Of Elmű Hálózati Kft., Angyalföld-Kőtér I. To Connect The Dunavirág Substation, The Construction Of The 132 Kv Cable Line With The Installation Of 132 Kv Cable Assemblies, The Establishment Of A Telecommunications Substructure Along The Route, The Construction Of An Optical Network In A Densely Publicized Environment The Total Area Affected By The Construction: 1,486 M² Construction Of The Construction Of The Substation: Construction Of A Switch And Control Building In Which The Following Will Be Located: • 1 3-Field, 132 Kv And 1 9-Cell, 11 Kv Switchgear, • 1 126/11 Kv Transformer And Its Star Point Devices, • 1 Auxiliary Operating Transformer, • Indoor Electrical Installation, • Building Mechanical Installation And Lightning Protection, In Addition, Construction Of The Following: • Outdoor Rainwater Drainage • Public Drinking Water Network Connection • Transformer And Device Transport Road • Parking Lot And Stairs Forming An Inseparable Part Of The Bidding Documentation As Stated In The Design Documentation. Installation Of Cable Lines: • Twisting The Existing Angyalföld – Kőtér I. 132 Kv Underground Cables Into The Planned Dunavirág 132/11 Kv Substation Directly In Front Of The Station. • Cutting The Angyalföld – Kőtér I. 76/132 Kv Ground Cable From The Dunavirág Substation Approx. 60 Meters Away At The Existing Joint In The Direction Of The Angyalföld Substation, Turning It From The Direction Of The Kőtér Substation To The New Track, And To The Substation Connection, And Laying A New 132 Kv Ground Cable In The Direction Of Angyalföld To The Connection Of The Gis Device Of The Dunavirág Substation, A Small Part New, A Larger Part On The Existing Track. • Establishing And Connecting The 132 Kv Cable Connection Between The 132 Kv Ground Cable Turning Points Of Angyalföld – Kőtér I And The Gis Equipment Of The Dunavirág Substation And Connecting The High-Voltage Cables Of The Transformer To The Gis Equipment By Installing 3 High-Voltage Plugs And 9 Gis End Caps. • Replacement Of The 132 Kv Ground Cable In The Existing Track, Laying 55 M Of New Cable In A Densely Publicized Environment And Inserting It With 3 Connectors. • Optical Network Construction Along The Route Of The 132 Kv Cable, As Well As Laying Out The Optical Cables In The Dunavirág Substation. • Construction Of A 125 M Substructure Consisting Of 4 Hdpe Protective Pipes And 1 Type N1 Breaker Facility Suitable For Pulling In Optical Telecommunications Cables On The Same Route. 76/132 Kv Na2xs(Fl)2Y 3X1x300rm/120Mm² Type, Na2xs(Fl)2Y 3X1x500rm/120Mm² Type Cable That Meets The Required Technical Requirements For The Implementation
Contact Information
Contact No.
+36 208074216
Email
marton.hadnagy@eon-hungaria.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114967621
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.