|
The Subject Of The Order Is The Modernization Of Vacant Buildings Owned By The Housing Management Company - Renovation Of Residential Premises, Divided Into Tasks: Task No. 1: Residential Premises At Ul. Lompy 6B/2. Material Scope Of The Subject Of The Order: 1. General Construction Works: 1) Demolition Works: A) Dismantling Partition Walls Made Of Plasterboards, B) Dismantling Suspended Ceilings Made Of Plasterboards And Pvc Panels, C) Dismantling Wall Coverings Made Of Unplastered Boards - Wainscoting, Storage Rooms, Wardrobes, D) Removing Wooden And Steel Door Frames From The Wall, E) Dismantling The Wall, F) Dismantling Ceramic Tile Floors,G) Removing Ventilation Grilles And Doors From The Wall,H) Removing Loose Internal Plasters On Walls And Ceilings,I) Dismantling Door Joinery,J) Dismantling The Kitchen/Bathroom Window Transom,K) Removing Old Wallpapers,L) Dismantling Curtain Rods, Hangers,M) Removing Plastic Floors, Floorboards And Panels,N) Disassembly Of Pvc Wall Flooring Strips,2) Flooring And Cladding Works: A) Preparation Of The Substrate, Removal Of Uneven Surfaces Of Walls And Floors, Moisture-Proof Insulation, Bituminous Coatings On Walls And Floors,B) Installation Of Self-Leveling Floors,C) Installation Of Floors With Stoneware Tiles,D) Facing Walls With Stoneware Tiles,E) Installation Of Floors With Floor Panels, Note: Floors Should Be Made So That The Level Is The Same In All Rooms. 3) Bricklaying And Plastering Works: A) Bricking Up Holes In Brick Walls, B) Building A 12 Cm Thick Partition Wall With Placing A Lintel Over The Door Opening, C) Casing Of The Water And Sewage Pipe Made Of Plasterboards, D) Making New Plasters On The Walls, E) Supplementing Plasters On Walls And Ceilings, 4) Painting Works: A) Preparation Of The Surface For Painting - Removing Cracks, Cleaning, Washing, Re-Filling The Surface, B) Applying Gypsum Plasters On Walls And Ceilings, C) Painting Walls And Ceilings With Emulsion Paints, D) Cleaning Works After Painting Works, 5) Door And Window Joinery: A) Delivery And Installation Of Door Frames And Interior Door Leaves (Incl. Including Bathrooms With An Air Vent), B) Replacement Of Handles And Signs In Existing Windows, 6) Finishing Works (Kitchen Equipment): A) Delivery And Installation Of A Free-Standing 4-Burner Gas Stove With An Electric Oven, B) Delivery And Installation Of A Cabinet With A Sink, C) Installation Of Ventilation Grilles In The Kitchen And Bathroom, 2. Installation Works: 1) Sanitary Installations: A) Disassembly Of The Existing Water And Sewage Installation, B) Disassembly Of Bathroom Fittings, Washbasins, Toilet Bowls, C) Installation Of Plastic Cold And Hot Water Pipelines, D) Installation Of Valves For The Water Supply System (Through, Non-Return), E) Installation Of Pvc Sewage Systems, F) Installation Of Pipeline Insulation, G) Flushing Of The Installation, H) Test Tightness Of The Water And Sewage Installation, I) Installation Of Bathroom And Kitchen Fittings, J) Installation Of A
|