The Subject Of The Order Are Construction Works Related To The Replacement Of The Roof Covering Of The Building Of The Village Community Center In Słonecznik, Słonecznik District, Plot No. 202. The Subject Of The Order Includes In Particular: 1. Roof Covered With Metal Tiles• Setting Up System Scaffolding Around The Renovated Building• Demolition Of The Existing Roof Covering Together With Ridge Tiles, Sheet Metal Flashings, Metal Gutters• Demolition Of The Battens, Checking The Technical Condition Of The Roof Structure, Replacing Rotten Structural Elements If Necessary• Performing Thermal Insulation Of The Roof Slope With Boards• Building Eaves For The Future Thermal Insulation Of External Walls• Perform Flashings From Boards Or Osb-3 Boards On The Eaves And Gables, Forming A Resistor For Pir Boards• Laying Sub-Battens And Battens As Well As The Roof Membrane• Performing Sheet Metal Flashings From Coated Sheets In Colors Agreed With Investor• Construction Of Gutters • Laying Of Modular Roof Tile-Like Sheets - Color To Be Agreed With The Investor • Protection Against Falling Snow • Reconstruction Of The Lightning Protection System • Segregation Of Waste, Recycling And Removal Of Non-Recyclable Waste.2. Roof Covered With Asphalt And Tar Felt• Demolition Of Asphalt And Tar Roofing• Cleaning Of Formwork• Flatness Of The Roof Slope With Osb-3 Boards • Thermal Insulation Of The Roof Slope With Pir Boards • Construction Of Eaves For Future Thermal Insulation Of External Walls• Processing Of Eaves And Gables With Boards Or Osb-3 Boards, Creating A Resistor For The Boards Pir• Execution Of Sheet Metal Flashings From Coated Sheets In Colors Agreed With The Investor• Execution Of Gutters• New Roof Coverings In Two-Layer Systems (A Felt System Allowing For A 25-Year Warranty On The Covering)• Reconstruction Of The Lightning Protection System• Segregation Of Waste, Recycling And Disposal Of Non-Recyclable Waste. Attention! 1. Due To The Lack Of Need To Prepare Technical Documentation, The Scope Of Work Is Described In The Bill Of Quantities And In The Opis File. The Specification Of Materials For Installation And The Scope Of Work Are Included In Stwiorb.2. Due To The Fact That The Construction Works Will Be Carried Out In An Active Facility, The Contractor Is Obliged To Organize And Carry Out The Works In A Way That Ensures Uninterrupted Operation Of The Village Community Center. Any Works That May Cause Difficulties In Its Activities Should Be Carried Out Outside The Operating Hours Of The Community Center, On Dates Previously Agreed With The Ordering Party. Additional Information: 1. A Detailed Description Of The Subject Of The Order In This Procedure Is Included In The Design Documentation (If Applicable), Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), Bills Of Quantities, Swz, Contract Template With Annexes.2. The Contractor Will Perform The Subject Of The Order On The Basis Of Design Documentation (If Applica
Contact Information
Address
Gmina Morąg,Morąg,14-300,Warmińsko-Mazurskie,Pl621 - Elbląski
Contact No.
897572231
Email
zp@morag.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114943724
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.