Construction Of 2 Buildings: Gfa Approx. 7,475M² Bri Approx. 46,648M³, 300M On Site Fence, Implement On-Site Sanitary Containers, Create And Remove Construction Water Connection To Be Area, Construction Site Equipment For Carrying Out The Overall Management, Railing On Components 150M, Protective Railing On Components 90M, Drainage Ditches Approx. 440M, Soil Replacement Material Mineral Mixture Approx. 7,260M³, Mineral Mixture Under The Floor Slab Approx. 570M³, Filling Work Areas With Mineral Mixture Approx. 1,000M³, Filling Work Rooms With On-Site Floor Material Approx. 530M³, Excavating Pipe Trench Approx. 200M³, Filling Pipe Trench Approx. 150M³, Cleanliness Layer Approx. 4,250M², Stb Foundations Approx. 1,280M³, Stb Walls Approx. 12,500M², Stb Supports Approx. 260M, Stb Ceilings Approx. 3,600M², Stb Beams Approx. 400M, Stb Stair Landings Approx. 100M², Stb Staircases 16 Pieces, Stb Prefabricated Parts 83 Pieces, Stb Semi-Finished Parts Approx. 2,120M², Core Drilling Approx. 135 Pieces, Perimeter Insulation Approx. 2,900M², Sealing Approx. 2,900M², Complete Documentation, Separate For Two Buildings
|