The Subject Of The Order Is The Reconstruction And Expansion Of The Foresters Lodge Building, Consisting In The Reconstruction Of The Buildings Internal Elements And The Construction Of A New Office Porch And The Main Porch, As Well As Insulating The Building From The Inside. The Existing Residential Building Serves As A Foresters Lodge With An Office Part. The Basic Scope Of The Reconstruction Of The Existing Residential Building Includes: - Liquidation Of The Existing Descent To The Basement And Stairs Leading To The Office From The South-West Side Of The Designed Building. In Their Place, It Is Planned To Build An Office Porch, - Construction Of A Semi-Open Porch Of The Main Entrance In A Wooden Structure, Covered With Ceramic Roof Tiles, Located On The South-Eastern Façade, - Enlarging The Basement Window Opening By 20 Cm Down From The Bottom Edge, Replacing The Existing Window With A New Steel Window With Insulation, Installing Steel Doors With Dimensions Of 95 X 95 Cm, Constructing A Retaining Wall Of Solid Bricks. 12 Cm, Placed 47 Cm Below The Ground Level And Protruding 19 Cm Above The Ground Level, Protected With A Waterproofing Foil, Construction Of A Water Drainage Channel With A 5% Slope Towards The Outflow, An Aggregate Substrate Should Be Made Under The Canal At A Depth Of 50 Cm From The Level Of The Canal Outflow, A Perforated Drainage Pipe With A Diameter Of 50 Mm Should Be Placed In The Aggregate Layer, The Entire Drainage System Should Be Covered With A Layer Geotextiles, - On The Ground Floor, Insulating The Wooden Ceiling From The Bottom, Consisting In Removing The Existing Finishing Layer Of The Ceiling, Installing New Insulation With Mineral Wool, Installing Selected Finishing Layers Of The Ceiling, - On The Ground Floor, Insulating The External Walls, Consisting In Installing An Additional Layer Of Insulation From The Inside With 10 Cm Of Pir Boards, - On The Attic Floor, Insulating The Knee Walls From The Inside, Consisting In Removing The Existing Layer Of Boards G-K, Cleaning And Leveling The Wall Surfaces, Application Of Deep-Penetrating Primer, Application Of A Selected Waterproofing Coating, Installation Of Metal Or Wooden Profiles, Application Of High-Density Mineral Wool In The Spaces Between The Profiles, Installation Of Pir And G-K Boards And Application Of Selected Finishing Layers. The Subject Of The Order Is Detailed In The Architectural And Construction Design, Technical Design, Technical Specifications For The Execution And Acceptance Of The Works, And The Bill Of Quantities, Attached To The Swz.
|