Investment Location: The Investment Area Is Located On Plots No. 125, 124, 126, 40 From District 0014 Borowno Kolonia In The Town Of Borowno Kolonia In The Commune Of Mykanów, Silesian Voivodeship. The Investment Includes: - An Asphalt Road Surface With A Substructure, - Roadsides With A Reclaimed Asphalt Surface. Parameters Technical Details Of Municipal Roads: 1. Road Functional Category: Internal Road2. Required Load Capacity: For Traffic Category Kr13. Road Surface: Asphalt Concrete4. Road Width: 4.0 - 4.5 M5. Roadside: On Both Sides - According To Pzt6. Drainage: Unpaved Area Within The Road Area7. Length Of The Section: 740.56 M. Structure Of The Designed Shoulders: - Layer Of Reclaimed Asphalt - 15 Cm. Structure Of The Designed Road: - Wearing Course Of Asphalt Concrete Ac11s (According To Pn-En 13108-1) - 4 Cm, - Binding Layer Of Asphalt Concrete Ac16w (According To Pn-En 13108-1) - 4 Cm, - A Layer Of Base Base Made Of A Mixture Unbound With Aggregate 0/31.5 Mm (According To Pn-En 13242) - 20 Cm, - A Layer Of Improved Subgrade Made Of Soil Stabilized With C1.5/2.0 Cement - 20 Cm. Sequence Of Works: - Carrying Out Geodetic Measurements, - Trenching For The Road Surface And Roadsides, - Construction Of Sub-Base, - Sprinkling The Road With Asphalt Emulsion, - Construction Of Road Surface Structure, - Construction Of Roadsides. The Actual Sequence Of Implementation Of Individual Elements Of The Works Will Be Determined By The Works Manager In Consultation With The Investor And Included In The Safety And Health Protection Plan. After The Execution Of The Contract, The Contractor Is Obliged To Prepare And Submit An As-Built Cost Estimate To The Ordering Party. 3. All Quantities Resulting From The Need To Perform The Necessary Construction Works Are Presented Simultaneously In The Bills Of Quantities And Technical Documentation, Including The Technical Specification For The Execution And Acceptance Of Works - Annex No. 8 To Swz.4. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation Referred To Above, The Technical Documentation And All Other Documents Constituting Annex No. 8 To The Swz And Any Information Published By The Ordering Party In The Course Of The Procedure, E.G. Answers To Potential Questions From Contractors. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than That Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design And Technical Documentation Constituting Annex No. 8 To Swz.5. After Completing The Works, The Contractor Is Obliged To Restore Order And Cleanliness In The Area Covered By The Works And To Remove All Construction Remains And Green Waste From The Inve
Contact Information
Address
Gmina Mykanów,Mykanów,42-233,Śląskie,Pl224 - Częstochowski
Email
zamowienia@mykanow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114905939
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.