The Subject Of The Order Is The Implementation Of Construction Works Consisting In Bringing The Building From An Open Shell State To A Condition Enabling The Use Of The Facility In Accordance With Its Intended Purpose. Currently, The Building Is In An Open Shell State. The Roof Is Covered With Formwork And Secured With Underlayment. The Scope Of The Task Includes: 1) Installation Of Counter Battens And Battens For The Roof Covering, 2) Installation Of A Roof Covering Made Of Metal Tiles, 3) Installation Of Roof Flashing And Roof Detail Elements, 4) Installation Of Roof Communication Elements, Including Chimney Steps, 5) Installation Of Window Joinery For Internal And External Sills, 6) Installation Of External And Internal Door Solar Panels, 7) Installation Of Hatches Roofs, 8) Construction Of A System Ceiling Made Of Fire-Resistant Plasterboards On A System Frame In Some Of The Rooms, 9) Construction Of A Modular Suspended Ceiling With Dimensions Of 60X60 Cm That Does Not Spread Fire, In The Class Of Sound Absorption And Acoustic Pressure, 10) Construction Of Floors With Thermal And Moisture-Proof Insulation, 11) Construction Of A Floor Made Of Fire-Resistant Osb Boards In The Attic Part Non-Utility, 12) Installation Of Thin-Layer Cement-Lime And Mineral Internal Plasters Troweled Smooth, 13) Installation Of Lightweight Walls Made Of Plasterboards In The Attic And Light Construction In Toilets, 14) Installation Of Sanitary Cabins And Separating Walls In Toilets, 15) Painting Of Walls And Ceilings, 16) Installation Of Ceramic And Stoneware Tiles, Cladding Decorative, 17) Construction Of Cold And Hot Water Installations, Hydrant Installations And Tightness Tests. Construction Of A Water Connection, 18) Construction Of A Sanitary Sewage System With Connection To The Network, Including Leakage Tests, 19) Construction Of A Central Heating Installation, Installation Of A Gas Boiler And Radiators, And Performance Of Leakage Tests Of The Heating Installation, 20) Construction Of A Connection To The Gas Network. Construction Of Gas Installation. Carrying Out Tightness Tests Of Gas Installations, 21) Carrying Out Gravity And Mechanical Supply And Exhaust Ventilation With Heat Recovery, Including Tightness, Effectiveness And Noise Tests, 22) Carrying Out Electrical Installations, Including The Buildings Power Supply, Internal Installations, Fire And Lightning Protection, And Carrying Out Measurements Confirming The Safety Of Use, 23) Construction Of A Ramp And Reinforced Concrete Entrance Stairs To The Building, Including Finishing And Installation Of Balustrades, 24) Thermal Insulation Of External Walls And Façade Works, 25) Construction Of A Band Around The Building, 26) Interior Finishing And Adaptation Of Rooms For The Olioc Warehouse, 27) Development Of The Area Around The Building, Including Hardening, Linear Drainage, Sidewalks, Parking Spaces, Lawns, Installation Of A Garbage Cover, Reconstruction Of Part Of The Fence, 28) Preparation Of As-Built D
|