1 The Subject Of The Order Is The Modernization Of The Observation Tower In Goniądz, Which Is Made Using Wooden Technology On Foundation Footings With Dimensions. Approx. 7.2 M X 3.5 M. The Supporting Structure Of The Observation Tower Is Made Of Poles With Dimensions. 20X20 Cm And 14 X 14 Cm, Reinforced By Diagonal Bracing And Horizontal Beams Made Of Pine Timber. 1) The Scope Of Modernization And Renovation Of The Observation Tower Includes: - Replacement And Strengthening Of Rotten, Rotten And Weakened Elements Of The Tower. - Replacement Of The Sheathing Of The Observation Tower By Replacing The Roof Formwork With Joints Made Of Thick Boards. Min. 25 Mm - Approx. 60 M2 - Replacement Of Wooden Stairs Elements - Treads - Approx. 28 Pcs - Demolition Of The Floor From Boards And Construction Of A New One From Logs With A Thickness Of At Least 50 Mm - Approx. 17.50 M2 - Roof Covering With Two-Layer Roofing Felt On A Wooden Base And Shingles = - Approx. 60 M2 - Fungicidal Impregnation Of Boards, Battens And Strips By Bathing With A Preparation That Does Not Pose A Threat To The Natural Environment - Approx. 20 M3 - Replacement Of Stair Railings With Handrails And A Viewing Balcony Approx. 32.2 M, - Carrying Out Preparatory Work On The Old Subfloor, Mechanical Cleaning And Washing And Performing Damp-Proof Insulation Of Foundations - Approx. 5 M2 - Protection Of Nodes At The Junction Of Columns With Braces, Beams And Foundation Footings - Approx. 36 Pcs. - Replacement Of Bracings Approx. 1 M3 - Replacement Of Stair Posts Approx. 0.04 M3 - Replacement Of Horizontal Beams Approx. 0.3 M3 - Setting Up The Scaffolding. - Performing Necessary Demolition And Securing Works Of The Construction Site. - Transport And Disposal Of Materials Generated During Demolition And Construction Works.2) The Detailed Scope Of Works Was Specified In The Technical Documentation Constituting Annex No. 7 To The Swz And Annex No. 13 To The Swz-Stwiorb.2. The Technical Documentation Constituting Annex No. 7 To The Swz Contains The Bill Of Quantities For Task No. 1. The Bill Of Quantities Is Of An Auxiliary Nature. It Is Used Only To Determine The Scope And Estimate The Value Of The Order And Cannot Be Treated As The Only Basis For The Implementation Of Works. All Construction Works Must Be Performed In Accordance With The Description Of The Subject Of The Order, Technical Specifications For The Execution And Acceptance Of Works, Applicable Standards And Construction Law Provisions. The Contractor Is Obliged To Carry Out All Works In Accordance With Construction Practice, Current Technical Knowledge, Applicable Standards, Legal Provisions And Guidelines Of Manufacturers Of Materials And Equipment. All Work Must Be Performed With Due Care, Ensuring Durability And Safety Of Use. If The Bill Of Quantities Or Documentation Does Not List All Elements, Materials Or Installations Necessary For The Proper Performance Of The Works And Ensuring Their Full Functionality, The Contractor Is
Contact Information
Address
Biebrzański Park Narodowy,Osowiec-Twierdza,19-110,Podlaskie,Pl843 - Suwalski
Email
sekretariat@biebrza.org.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114905808
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.