|
Solar Installation – Res Municipal Energy Partnership Programs For Municipalities Of The Świdnica Poviat (Ppek I And Ppeki Ii). 1. The Subject Of The Order Is The Design, Delivery And Assembly Of Hybrid Photovoltaic Micro-Installations With Energy Storage Facilities And A Management System Integrating These Generation Systems With The Polish Energy Market, Intended For Operation In Municipal Public Utility Facilities: 1) Rural Community Center In Lutomi Górna, Lutomia Górna 1, 2) Rural Community Center In Stachowice, Stachowice 13B, 3) Rural Community Center In Grodziszcz, Grodziszcze 56R, 4) Village Community Center In Burkatowo, Burkatów 53C, 5) Village Community Center In Bojanice, Bojanice 53A, 6) Sports And Recreation Center In Witoszów Dolny, Witoszów Dolny 60, 7) Sports And Recreation Center In Witoszów Dolny - Swimming Pool, Witoszów Dolny 60, 8) Primary School In Mokrzeszów, Mokrzeszów 23A, 9) Primary School In Bystrzyca Górna, Bystrzyca Górna 64, 10) Sports Locker Room In Pszenna, Ul. Kolejowa 1, 11) Public Kindergarten In Bystrzyca Dolna, Bystrzyca Dolna 55A, 12) Fire Station In Witoszów Dolny, Witoszów Dolny 71, 13) Village Community Center In Komorów, Komorów 53B, 14) Primary School In Lutomi Dolna, Lutomia Dolna 12, 15) Primary School In Pszenna, Ul. Wrocławska 15, 16) Village Community Center With A Sports Locker Room In Opoczka, Makowice 100, 17) Commune Nursery In Pszenna, Ul. Słoneczna 16, 18) Building Of The Świdnica Commune Office, Ul. Głowackiego 4, Świdnica, 19) Village Community Center In Boleścin, Boleścin 35Ap. 2. The Order Includes In Particular: 1) Development Of Technical Documentation Required By Law, Meeting The Requirements Specified In The Swz And Annexes, 2) Obtaining All Legally Required Arrangements, Opinions And Notifications, Especially In The Field Of Fire And Structural Safety, 3) Delivery Of Devices And Materials, Supporting Structures, 4) Assembly, Commissioning, Configuration And Commissioning Of The Installation, 5) Performance Of The Necessary Accompanying Construction Works, Including Adapting The Rooms In Which The Inverters And Energy Storage Units Will Be Installed To The Conditions Fire Protection, 6) Preparation Of Acceptance Documentation, Including In Particular Technical Data Sheets, Technical Approvals, Certificates Of Devices And Materials Used In The Construction Of The Installation, Acceptance And Measurement Protocols And As-Built Diagrams, 7) Preparation Of Operating Instructions And Training Of Installation Users. 3. The Detailed Scope And Method Of Execution Of The Order Are Set Out In Annex No. 11 To The Swz Subject Requirements For Hybrid Systems And The Documentation Included In The File Location Descriptions Constituting Annex No. 12 To The Swz. 4. The Ordering Party Requires That For The Locations Specified In Point 1, Points 6 And 7, The Pv Modules Be Placed On A Carport Type Supporting Structure. Due To The Existing Land Development, The Employer Requires The Use Of Pile Foundations For The Construction Of The System Shelter For Both Locations. 5. The Ordering Party Requires, As Part Of The Order, The Installation Of A Lightning Protection System In Facilities That Do Not Have It And In Those That Do Not Have It.
|