|
Tender For Vi Work At Kozhakotoor-Ambayathingal RoadFitting and providing one HT Stay for 11kV pole, including digging andback filling pit in ordinary soil.No 24 1373.7300 32969.522 120 Fitting and providing one Strut using HT PSC pole including digging andback filling pit in ordinary soil.No 1 3056.9100 3056.913 702 Labour charges for loading HT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle).No 2 762.1400 1524.284 122 Fitting and providing one HT Fly stay for 11kV pole using HT PSC poleincluding digging and back filling pits in ordinary soil, drawing sufficientlength of GI earth leads to the ground for earthing (excluding provision ofearthing).No 1 4805.9500 4805.955 163 Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinary soil & backfilling.No 18 1086.2300 19552.146 30.1 Stringing of one km 3 PH 11kV line with XLPE Insulated ACSRRaccoon or equivalant (3 conductors) after fitting insulators, bindingconductors to pin insulators using suitable tie and anchoring with wedgetype anchoring clamps including cutting and removing tree brancheswherever necessary excluding cut point works.m 570 43.4900 24789.307 726 Transporting poles by hired vehicle to a distance upto 5km and carryingupto 4 numbers of poles excluding loading& unloading charges.Trip 6 3142.2600 18853.568 363 Drilling hole of various sizes on existing Channel/Cross Arm. Fitting and erecting one HT PSC Single Pole in position, including fittingcross arm, digging and back filling pit in ordinary soil (as per standards),drawing sufficient length of GI earthing leads from F clamp through Vcross arm to the ground for earthing (excluding provision of earthing).No 15 3274.3600 49115.4010 127 Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. No 15 434.9100 6523.6511 128 Additional rate for excavation of one Pit for HT Pole/HT Stay in HardLaterite.No 15 868.7700 13031.5512 405 Additional rate for refitting/redoing one Shackle Set, including reshaclingone span, while renewing any type of LT pole.No 24 341.8600 8204.6413 610 Dismantling one ordinary street light/CFL/LED fitting from existing poleand refitting the same on newly erected pole including disconnecting andreconnecting wires.No8 492.4100 3939.2814 553 Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same.No5 1008.8600 5044.3015 554 Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. attached thereon and stacking the same.No 12 1923.6400 23083.6816 451 Disconnecting and lowering down the single phase WP serviceconnection with guy wire from the OH line and reconnecting the sameafter completing the line work.No 38 96.1800 3654.8417 452 Disconnecting and lowering down the three phase WP service connectionwith guy wire from the OH line and reconnecting the same aftercompleting the line work.No3 149.5000 448.5018 420 Transferring LT three phase 4/5 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete.No 18 1778.3200 32009.7619 419 Transferring LT single phase 2/3 wire OH line to newly erected HT/LTpole including dismantling existing cross arm and insulators, refitting thesame on the new pole, binding etc. complete.No4 879.2300 3516.9220 170 Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole including conveyance of materials.No 10 481.9500 4819.5021 169 Fitting one Additional V cross arm in existing single pole includingconveyance of materials.No5 481.9500 2409.7522 175 Fitting one LT 4 line cross arm on HT or LT existing poles includingfitting insulators and binding the same with LT Line.Erecting one 100kVA Transformer to existing DP and giving connections,including loading from TMR/SRS/other stacking place & unloading atsite but excluding cost for transporting transformer.No1 7153.0000 7153.0024 728 Transporting Transformers by hired vehicle to a distance upto 5km andcarrying upto 2 numbers of 63/100/160/250kVA Transformers / RingMain Units excluding loading& unloading charges.Trip1 3142.2600 3142.2625 157 Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit (0.45x0.45x2.5m) at a minimum distanceof 1.5m away from the pole/structure and maintaining standard distancebetween different earth pipes in ordinary soil & backfilling.No7 2266.5500 15865.8526 161 Additional rate for excavation of one Earth Pit (2.5m depth) in HardLaterite.No7 1737.5500 12162.8527 115 Additional rate for providing one disc set, PG clamp etc. complete, on anytype of HT pole for making cut point.No3 158.9100 476.7328 117 Fitting and erecting one HT Double Pole Structure using A type pole inposition including fitting 2 No. channel cross arm, digging and backfilling pit in ordinary soil, drawing sufficient length of GI earthing leadsthrough all cross arms to the ground for earthing (excluding provision ofearthing).No1 10473.3600 10473.3629 139 Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LTconnections upto OH lines, etc. on existing DP structure, Fixingdistribution box/provision for one set (3No.) of LT fuses, , drawingsufficient length of GI earthing leads to the ground for earthing, excludingprovision of earthing & mounting of Transformer on poles.No1 10905.1400 10905.1430 703 Labour charges for loading HT A type pole from the stacking place andunloading the same at work site (transportation by any vehicle).No2 906.4100 1812.8231 153 Erection of LT 2 way distribution box (normal size 130x40x90cm) onexisting cross arm, giving connection including cable and earthconnection (excluding earthing).No1 3758.4100 3758.4132 951 Constructing Transformer plinth of size 1.5x1.5x1.5m on 1.8x1.8x0.75mbasement inclusive of cost of all materials. [Excavation 1.8x1.8x0.75m,Random Rubble in CM(1:6) 1.8x1.8x0.75m + 1.5x1.5x1.5m, concrete(1:2:4, 20mm) 1.5x1.5x0.10 m, plaster CM (1:3) 12mm, 1.5x1.5m,Pointing CM (1:3) 1.5x1.5mx 4 sides].No1 44051.9300 44051.9333 952 Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.34 953 Providing Transformer fencing to a height of 1.8 m above ground levelusing MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runsof 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mmDia @ 10cm c/c for verticals, providing gate with locking arrangements,providing danger board & name board, embeding the legs in cementconcrete 1:2:4, footing of size 30cmx30cmx50cm, painting with syntheticenamel paint two coats over one coat of iron primer etc complete, inclcost of transportationsq.m 24 1589.7200 38153.2835 954 Cleaning and levelling of transformer yard/RMU, spreading 40 mmbroken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6mm broken stone, after constructing a curb wall of height 20cm aboveground and 10cm below level including cost of all materials and chargesfor conveying, spreading, consolidating etc.sq.m 12 769.1800 9230.1636 113 Fitting and erecting one HT A type Single Pole in position, includingfitting cross arm, digging and back filling pit in ordinary soil (as perstandards), drawing sufficient length of GI earthing leads from F clampthrough V cross arm to the ground for earthing (excluding provision ofearthing).No1 4143.1400 4143.1437 132 Additional rate for excavation of Pit for A type pole in Hard Laterite. No3 1303.6800 3911.0438 171 Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), inexisting 11kV DP including conveyance of materials.No1 564.5500 564.5539 156 Fitting one additional Fuse unit and giving connection from Transformerto fuse and Distribution box to LT OH line.No6 351.2700 2107.6240 151 Installing one DTR Meter with box (normal size 40x25x100cm) onexisting poles including fixing of 3 CTs on bus bar, laying andtermination of control cable using proper lugs, fixing of meters,capacitors, control fuses and giving the complete connections includingconveyance of materials.No1 3758.4100 3758.4141 30.3 Stringing, tensioning, fitting cross arms, insulators and binding, givingjumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent,for one km LT three phase 4 wire line including cutting and removing treebranches wherever necessary and conveyance of all materials (exceptpoles) from stacking place.m 400 42.2100 16884.0042 204 Erecting one LT PSC Pole in position including digging & back filling pitin ordinary soil.Labour charges for loading LT PSC pole from the stacking place andunloading the same at work site (transportation by any vehicle).No 8 478.8200 3830.5644 208 Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. No 5 217.4500 1087.2545 209 Additional rate for excavation of one Pit for LT Pole/LT Stay in HardLaterite.No 6 434.9100 2609.4646 205 Providing Stay for LT poles including digging & back filling pit inordinary soil.No 5 938.8200 4694.1047 206 Providing Strut using LT PSC pole including digging and back filling pitin ordinary soil.No 1 1887.0500 1887.0548 207 Providing Fly stay for LT pole using LT PSC pole including digging andback filling pit in ordinary soil.No 1 3062.1400 3062.1449 565 Dismantling (without damage) one km LT single phase 2 wire OH lineconductor by dismantling cross arms, insulators and stacking theconductors in rolls properly.
|