|
Tender For Erection Of Transformer At Vadakkan Paloor Erecting One 100Kva Transformer To Existing Dp And Giving Connections, Including Loading From Tmr/Srs/Other Stacking Place & Unloading At Site But Excluding Cost For Transporting Transformer. No 1 7153.0000 7153.00 2 728 Transporting Transformers By Hired Vehicle To A Distance Upto 5Km And Carrying Upto 2 Numbers Of 63/100/160/250Kva Transformers / Ring Main Units Excluding Loading& Unloading Charges. Trip 1 3142.2600 3142.26 3 119 Fitting And Providing One Ht Stay For 11Kv Pole, Including Digging And Back Filling Pit In Ordinary Soil. No 7 1373.7300 9616.11 4 115 Additional Rate For Providing One Disc Set, Pg Clamp Etc. Complete, On Any Type Of Ht Pole For Making Cut Point. No 3 158.9100 476.73 5 116 Fitting And Erecting One Ht Double Pole Structure Using Psc Pole In Position Including Fitting 2 Channel Cross Arms, Digging And Back Filling Pit In Ordinary Soil, Drawing Sufficient Length Of Gi Earthing Leads Through All Cross Arms To The Ground For Earthing (Excluding Provision Of Earthing). No 2 8735.8200 17471.64 6 139 Fitting 5 Channel Cross Arms, Ab Switch, Do Fuse, La(Ord), Ht & Lt Connections Upto Oh Lines, Etc. On Existing Dp Structure, Fixing Distribution Box/Provision For One Set (3No.) Of Lt Fuses, , Drawing Sufficient Length Of Gi Earthing Leads To The Ground For Earthing, Excluding Provision Of Earthing & Mounting Of Transformer On Poles. No 1 10905.1400 10905.14 7 169 Fitting One Additional V Cross Arm In Existing Single Pole Including Conveyance Of Materials. Rilling Hole Of Various Sizes On Existing Channel/Cross Arm. No 42 16.7300 702.66 9 702 Labour Charges For Loading Ht Psc Pole From The Stacking Place And Unloading The Same At Work Site (Transportation By Any Vehicle). No 27 762.1400 20577.78 10 171 Fitting One Additional 2.4M/3M Channel Cross Arm (100X50X6Mm), In Existing 11Kv Dp Including Conveyance Of Materials. No 9 564.5500 5080.95 11 156 Fitting One Additional Fuse Unit And Giving Connection From Transformer To Fuse And Distribution Box To Lt Oh Line. No 6 351.2700 2107.62 12 955 Providing One Earth Using Gi Earth Pipe Of Size 38.1Mm Dia, 2.5M Length Including Digging Separate Pit (0.45X0.45X2.5M) At Standard Distance (1.5M) Away From The Pole/Structure In Ordinary Soil & Backfilling The Pit With 15Cm Alternate Layer Of Charcoal, Salt And Sand Up To 90Cm From The Bottom. Including The Cost Of 20Kg Salt, 25Kg Charcoal, Excluding Supply Of Earth Pipe. No 11 4245.5900 46701.49 13 726 Transporting Poles By Hired Vehicle To A Distance Upto 5Km And Carrying Upto 4 Numbers Of Poles Excluding Loading& Unloading Charges. Trip 7 3142.2600 21995.82 14 953 Providing Transformer Fencing To A Height Of 1.8 M Above Ground Level Using Ms Angle Frames Of Size Isa 50X50X6Mm For Outer Frame, 2 Runs Of 40 X 6 Ms Flat For Horizondal Brasing And Grills With Ms Rods 8 Mm Dia @ 10Cm C/C For Verticals, Providing Gate With Locking Arrangements, Providing Danger Board & Name Board, Embeding The Legs In Cement Concrete 1:2:4, Footing Of Size 30Cmx30Cmx50Cm, Painting With Synthetic Enamel Paint Two Coats Over One Coat Of Iron Primer Etc Complete, Incl Cost Of Transportation Sq.M 24 1589.7200 38153.28 15 954 Cleaning And Levelling Of Transformer Yard/Rmu, Spreading 40 Mm Broken Stone In Yard For A Thickness Of 10 Cm Above Bed Of 10 Cm Thick 6 Mm Broken Stone, After Constructing A Curb Wall Of Height 20Cm Above Ground And 10Cm Below Level Including Cost Of All Materials And Charges For Conveying, Spreading, Consolidating Etc. Sq.M 15 769.1800 11537.70 16 1107 Erection Of Anchor Clamp / Dead End Clamp For 11Kv Abc Of Any Size E 22 164.6700 3622.74 17 C-202223- 6562-8 Erection Of Stainless Steel Strap And Buckles E 50 50.0000 2500.00 18 1108 Erection Of Suspension Clamp For 11Kv Abc Of Any Size E 15 164.6700 2470.05 19 1102 Stringing Of 11 Kv Aerial Bunched Cable Of Size 3 X 120 + 1 X 95 Sqmm With Bare/Insulated Messenger Through Existing Poles Fiting One No Mvt On Existing Cross Arm Including 2 Nos End Termination (For One Phase) Of Any Rating For 11 Kv Ab Cable E 1 963.0000 963.00 21 163 Providing One Coil Earth Using No.8 Gi-Earth Wire (50Mm Dia, 115 Turns) Including Digging Separate Pit (0.45X0.45X1.5M) At Standard Distance Away From The Pole/Structure In Ordinary Soil & Backfilling. No 5 1086.2300 5431.15 22 120 Fitting And Providing One Strut Using Ht Psc Pole Including Digging And Back Filling Pit In Ordinary Soil. No 2 3056.9100 6113.82 23 122 Fitting And Providing One Ht Fly Stay For 11Kv Pole Using Ht Psc Pole Including Digging And Back Filling Pits In Ordinary Soil, Drawing Sufficient Length Of Gi Earth Leads To The Ground For Earthing (Excluding Provision Of Earthing). No 1 4805.9500 4805.95 24 167 Fitting One Set Ab Switch On Existing Dp, Giving Connection And Drawing Sufficient Length Of Gi Earthing Leads To The Ground For Earthing, Excluding Provision Of Earthing. No 1 2795.5500 2795.55 25 112 Fitting And Erecting One Ht Psc Single Pole In Position, Including Fitting Cross Arm, Digging And Back Filling Pit In Ordinary Soil (As Per Standards), Drawing Sufficient Length Of Gi Earthing Leads From F Clamp Through V Cross Arm To The Ground For Earthing (Excluding Provision Of Earthing). No 20 3274.3600 65487.20 26 128 Additional Rate For Excavation Of One Pit For Ht Pole/Ht Stay In Hard Laterite.
|