|
1. The Subject Of The Order Is The Implementation Of The Task Titled: Changing The Method Of Heating Residential Premises (Vacant Premises) Along With Modernization - Renovation Of Residential Premises In Piła At Ul. Śniadeckich 2/2 And Ul. Śniadeckich 2/5.2. The Contractor Should Complete The Subject Of The Order In Accordance With Applicable Regulations And Standards, To The Extent And In The Manner Specified In Detail In The Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And Other Documents Constituting Annexes To This Swz 3. The Scope Of Construction Works Includes, Among Others: 1) Ul. Śniadeckich 2/2A) Replacement Of Door Joinery, B) Replacement Of Wooden Box Windows With Pvc, Together With The Installation Of Air Vents, C) Replacement Of Window Sills, D) Dismantling Of Wainscoting And Grate, E) Dismantling Of Plasterboard Cladding, F) Dismantling Of Suspended Ceilings, G) Construction Of A Partition Wall (Dividing The Room) From Plasterboards, Including Soundproofing, H) Execution Floors Made Of Floor Panels With Skirting Boards,I) Nailing Osb Boards To The Floors And Leveling Them,J) Dismantling Floors And Wall Coverings Made Of Ceramic Tiles,K) Laying Wall And Floor Tiles,L) Placing Floor Panels With Skirting Boards On The Floors,M) Scraping And Washing Off Old Paint From Walls And Ceilings,N) Priming, Plastering, Painting Walls And Ceilings, O) Garbage Collection - Container, P) Installation Of Carbon Monoxide Detectors, Q) Replacement Of The Central Heating Installation With Radiators, R) Installation Of A Toilet Bowl, Sink, Washbasin, Shower Cabin, S) Replacement Of A Four-Burner Gas Stove With An Oven, T) Expansion Of The Water And Sewage System, Gas Installation, U) Installation Of A Water Meter, V) Installation Of A Chimney Liner For A Gas Boiler, W) Replacement Of The Installation Electricity With The Provision Of Electrical Protocols,X) Construction And Hanging Of An Information Board On The Building,2) Ul. Śniadeckich 2/5A) Replacement Of Door Joinery, B) Replacement Of Wooden Box Windows With Pvc And Installation Of Air Vents, C) Replacement Of Wooden Box Balcony Doors With Pvc, D) Replacement Of Window Sills, E) Dismantling Of Wainscoting With A Grate, F) Dismantling Of A Wooden Partition Wall Covering With A Grate, G) Dismantling Of A Wooden Ceiling Covering With A Grate, H) Execution Partition Wall Made Of Plasterboards With Soundproofing (Separation Of The Bathroom), I) Dismantling Pvc Floor Coverings Together With Skirting Boards, J) Nailing Osb Boards To The Floors And Leveling Them, K) Dismantling Floors And Wall Cladding Made Of Ceramic Tiles, L) Laying Wall Tiles, M) Placing Floor Panels With Strips On The Floors, N) Scraping And Removing Old Paint From Walls And Ceilings,O) Priming, Plastering, Painting Walls And Ceilings,P) Constructing A Protective Balustrade For The Roof (Unusable Terrace),Q) Garbage Collection - Container,R) Installing Carbon Monoxide Sensors,S) Deve
|