|
The Subject Of The Order Is Part I Of The Expansion Of District Road No. 1909D On The Section 0+615 Km - 2+100 Km In Tokary (Ul. Osiedlowa And Nowe Osiedla), Together With The Construction Of A Pedestrian Road, Construction And Reconstruction Of Exits, Construction And Reconstruction Of Road Culverts, Culverts Under Exits, And Construction And Reconstruction Of The Sewage, Electricity And Telecommunications Networks. The Subject Of The Order Also Includes The Construction Of Two Transition Sections Connecting The Newly Constructed Road Section With The Existing Road At The Beginning And End Of The Section. The Total Length Of The Target Section Covered By The Order Is Approximately 1,485 Km And The Transition Sections Are Approximately 50 M. The Scope Of The Order For The Section Includes: A) Expansion And Reconstruction Of The Road, B) Construction And Reconstruction Of Exits, C) Construction Of A Pedestrian Road, D) Construction And Reconstruction Of Road Culverts And Culverts Under The Exits, E) Strengthening Of The Inlets And Outlets Of The Culverts And Drainage Elements, F) Construction And Reconstruction Of The Roadside, G) Reconstruction Of Ditches, H) Reconstruction Of The Fence, I) Construction Of A Storm Sewage System Together With Street Drains, J) Reconstruction Of Technical Infrastructure Colliding With The Planned Development Of The Road, K) Cutting Down Trees And Bushes Colliding With The Planned Development Of The Road, L) Preparation Of The Design, Obtaining Approval And Implementation And Maintenance Of Temporary Traffic Organization, M) Approval And Introduction Of A New Target Traffic Organization (Horizontal And Vertical Markings) Along With Road Safety Elements, N) Execution Of Transition Sections, As Well As Works Accompanying The Implementation Of The Works: A) Preparation Of The Construction Site, B) Preparation, Maintenance And Liquidation Of The Construction Facilities, C) Measurement Works, Preparation Of A Geodetic Inventory, D) Laboratory Tests, E) Preparatory Works, F) Securing The Area, G) Securing The Network For The Duration Of The Works, H) Securing The Excavations And Their Drainage, I) Works Earthworks,J) Demolition Works,K) Technical, Technological, Workshop, Working And As-Built Documentation,L) Obtaining A Decision On The Occupancy Permit, Carrying Out All Activities Necessary To Obtain It,M) Making And Installing Information Boards,N) Supervising The Natural, Archaeological, Sapper And Network Operators,O) Updating All Arrangements,P) Planting Trees And Sowing The Area With Grassdesign Parameters:A) Traffic Category Kr 3B) Technical Class Of Public Road Zc) Design Speed In The Development Area 50 Km/Hd) Permissible Load 115 Kn/Axle) Road Width 6.00 Mf) Roadside Width 1.00 Mg) Sidewalk Width 2.00 M The Ordering Party Guarantees That The Minimum Value Of The Contractors Performance Will Not Be Lower Than 70% Of The Gross Contractual Remuneration. Warranty: 1) Warranty Period For The Subject Of The Order, Exc
|