The Subject Of The Order Are Construction Works Consisting In The Implementation Of The Project Titled: Modernization Of Water Supply Infrastructure In The Trzebieszów Commune Financed Under Contract No. Felu.03.04-Iz.00-0027/25-00 Of March 25, 2026. Measure 3.4 Sustainable Water And Sewage Management (Project Type 1-3) Of Priority Iii Protection Of Environmental And Climate Resources Of The European Funds For Lubelskie Program 2021-2027, In The Scope Of: Suw Karwów - Technology: Dismantling Of Internal Existing Technological Installations, Devices And Pipelines, Installation Of New Equipment In The Sanitary Facility At The Water Treatment Station (So-Called White Assembly), Installation Of Devices Related To Water Treatment Technology With A Capacity Of Q Daily Max.. = 3500 M 3 /H, Without Second Stage Pumping Station, Uv Lamp And Chlorination Plant, Ensuring Continuity Of Water Supply - Installation Temporary Overvoltage Of The Existing Water Supply Networks And Inclusion In The New Technological Installation, Pressure Testing And Flushing Of The Installation, Disinfection Of Pipelines, Tidying Up The Construction Site. Suw Karwów - Construction/Electrical Scope: Electrical Power Supply For Technological Devices, Reconstruction Of Internal And External Lighting Installations, Replacement Of Existing Electrical Installations, Main Switchboard, Reactive Power Compensation, Removal Of Plaster Defects On Walls And Possibly Removal Of Unevenness And Re-Plastering, Painting Works And Finishing Laying Terracotta On The Floors In All Rooms, Laying Tiles On Walls Up To 2 Meters High In All Rooms, Painting Internal Walls And Ceilings Along With Filling In Any Gaps, Installation Of A Dn15 Water Meter Set With A Dn15 Anti-Contamination Valve At The Outlet For Social And Social Purposes, Together With Shut-Off Valves Before And After, Together With The Installation Of Water Installations For Domestic Purposes Made Of Stainless Steel With Connections Pressed, Replacement Of Toilet Equipment With A Shower, Equipment Of The Social Room: Desk, Lamp, 3 Chairs, 2 Metal Cabinets, Laptop For Monitoring And Reading Visualization Of The Operation Of The Suw And The Well. Reconstruction Of The Sanitary Sewage System In The Technological Hall With Installation Of Floor Drains, Replacement Of Internal Lighting With Led. External Lighting - On The External Wall Of The Suw Building, On All Sides. Cctv Of All The Suw Rooms And The Suw Area, Including With A 40-Inch Screen In The Suw Social Room, Motion Sensors With Alarm In All Suw Rooms, Ends Of Tank Manholes, Wells, Replacement Of Fences With A Total Length Of L = 282.7 M, Including Remote-Controlled Sliding Entrance Gates And Code: Pcs. 2: Dimensions [Height X Width X Depth Cm]: 220 X 400 X67, Panel Gate Dimensions [Height X Width X Depth Cm]: 154 X 100 X 67, Wire Thickness 5.5. Replacement Of Window Joinery: Duty Room 112X85 1 Pc. Chlorine Room 112 X 85 1 Pc. Coal Storage Room 112 X 85 1 Pc. Boiler Room 112 X 85 1 Pc.
|