|
Morius - Renovation Of The Building - In The Scope Of Reconstruction And Renovation Of The Interior Of The Facility And Renovation Of The Roof Of The Morius Building In Głogów At Ul. Norwida 5 (Register Plot No. 77, Precinct 0006 Hutnik, Town Of Głogów). Scope Of Works: I. Demolition Works Include In Particular: - Demolition Of Parts Of Partition Walls, - Demolition Of The Chimney, - Dismantling Of Doors And Frames, - Breaking Out Door Openings To The Required Widths, - Dismantling Of Floor Layers, - Dismantling Of Lintels In Places Of Widening To Install Wider Ones, - Cutting Or Tearing Off Floor Coverings In Rooms Undergoing Renovation, - Cutting Off Ceramic Tiles From Walls And Floors, - Removal And Waste Disposal.Ii. Construction And Renovation Works Related To The Interior Of The Facility Include: - Renovation And Reconstruction Of Rehabilitation And Therapeutic Rooms And Corridors, - Reconstruction Of Existing Toilet And Bathroom Rooms, Social Room, Corridor And Therapeutic Rooms, - Completing The Ceiling Between The Ground Floor And The 1St Floor With The Reconstruction Of All Layers Of Floors And Ceilings, - Reconstruction Of Internal Door Joinery And Replacement Of Windows And External Doors Along With The Installation Of Lintels, - Brickwork In The Walls, - Internal Plastering, - Painting Of Walls And Ceilings, - Floor And Wall Cladding, - Reconstruction Of Internal Installations (Sanitary And Electrical) To The Necessary Extent In Some Of The Rooms Covered By The Investment, - Interior Finishing Works. • The Sanitary Industry Includes, Among Others: - Dismantling Of All Sanitary Equipment Along With Accessories, Faucets And Handles, - Reconstruction Of The Internal Sanitary Sewage System In Terms Of Reconstruction And Connection Of New Devices In Toilets - Internal Water Installation In The Scope Of Reconstruction And Connection Of New Sanitary Devices, - Internal Central Heating Installation In The Scope Of Changing The Location Of Radiators - Necessary To Move, - Installation Of Sanitary Installation Devices, - Dismantling The Old And Installing A New Sanitary Sewage Line Together With A Sewer, - In All Sanitary Rooms, A Tap With A Connector, A Sewage Grate And A Valve Should Be Installed. • The Electrical Industry Includes, Among Others: - Disassembly Of Electrical Devices In Rebuilt Buildings Parts (Walls To Be Demolished) - Reconstruction Of The Internal Electrical Installation In Terms Of Changing The Cabling Routes And Installation Of Electrical Devices (Sockets, Switches, Buttons, Lighting Fixtures), - Dismantling The Old One And Installing Internal Low-Current Installations (Calls, Alarms, Radio Node, Etc.) To The Extent Necessary To Be Modified Due To The Demolition Of Walls, • Ventilation Of Toilets Includes, Among Others: - Ventilation Of Sanitary Rooms Should Be Performed Using Fans Wall/Ceiling, Duct With Speed Regulators In Existing Ventilation Ducts, • Equipment - Purchase, Delivery And Installation Of Devices And Equip
|