|
The Subject Of The Order Is: Renovation Of Rooms In The Technical Building Of The Kw Psp Kraków. The Renovation Will Cover Part Of The Building In The Scope Of The Indicated Rooms. The Construction Works Are Aimed At Improving The Living Conditions And General Aesthetics Of The Rooms, Improving The Working Conditions Of The Commands Employees. There Will Be Hygiene And Sanitary Rooms (Bathroom), A Cloakroom (Separated From The Existing Corridor), Two Independent Garage Boxes, One Of Them Connected To Three Storage Rooms (With Access From The Outside Of The Building), Two Office Rooms, A Recreation Room With A Kitchenette And A Recreation Room (Bedroom - With A Bunk Bed). The Properties In Terms Of Resistance, Insulation And Fire Tightness Of The Ceilings (Rei) Will Not Be Changed. As Well As Structural Walls Separating The Rooms Subject To Reconstruction. It Will Not Increase The Number Of People Staying In The Rooms Covered By The Study, And There Will Be No Change In The Conditions Of Evacuation From These Rooms To The Safe Zone. There Are No Hazardous Or Easily Flammable Materials In The Rooms, In Accordance With Fire Protection Requirements. The Basic Scope Of Works Includes: Disassembly: - Dismantling Of Lighting Fixtures, - Dismantling Of Accessories (Sockets, Connectors, Etc.). - Dismantling Of All Fittings And Equipment In Sanitary Rooms, - Dismantling Of Electrical Installations In Sanitary Rooms, - Dismantling (Or Securing) Panel Radiators, - Disassembly Of Interior Doors. Demolition Works: Partition Walls, Removal Of The Top Layer Of The Floor (Stoneware/Ceramic Tiles And Adhesive Mortar, Concrete Cubes In Garages And Warehouses), Removal Of Partition Walls, Removal Of Wall Tiles. Renovation Works (Including Assembly): Construction Of New Partition Walls, Partial Change Of Spatial Division, Construction Of New Stoneware Floors, Surface-Hardened Concrete And Floor Panels, Plastering Of Walls (Supplements), Installation Of Suspended (Panel) Ceilings - In Offices, Recreation Room With Kitchenette, Bedroom, Bathhouse, Cloakroom, Corridor, Cladding Of Walls With Ceramic Tiles, Installation Of New Doors, Point Bricking Of Door Openings, Installation Of Ventilation Grilles With Exhaust Fans (Bathroom Type), - Electrical Works In The Field Of Cabling And Installation Of Elements Of Plug Sockets, Connectors, Dvb-T2 Terrestrial Television Sockets, Lan Network Sockets, Installation Of A 19 Rack Box, Etc., - Construction Of A New Electrical Installation In Sanitary Rooms, - Connection Of Panel Radiators (Reassembly), - Installation Of A New Radiator (Larger), - Installation Works In The Field Of Renovation Of Rooms (Rooms). Sanitary: Connection Of Utensils, Replacement Of Pipework, Installation Of New Fittings, Replacement Of Sections Of Sewage And Water Supply Systems), Installation Of Permanent Equipment, Installation And Comprehensive Connection Of A Hand Dryer, Capacity Heater (Using The Existing One), Other Finishing Works. The Contractor Wil
|