1. The Subject Of The Order Is The Reconstruction Of The Municipal Cultural Center Along With Installations - Stage Iv. Stage Iv Was Separated From The Entire Scope Of The Reconstruction Of The Building And Includes Fully Functional Elements That Can Function Before The Completion Of The Entire Scope Of Reconstruction, Which Enables Their Use Before The End Of The Reconstruction. The Scope Of Construction Works Was Specified In The Design Documentation Attached To The Swz.2. As Part Of The Task In Question, Works In The Following Industries Should Be Performed: 1) In The Construction And Architectural Industries, They Mainly Involve The Reconstruction Of Some Rooms On The First Floor Of The Building Marked In The Drawings In The Design Documentation With Numbers 1.10, 1.11, 1.12, 1.13, 1.14, 1.16 (Only In Front Of Rooms 1.13 And 1.14), 1.23, 1.24, 1.25, Including: - Construction Of System Fire-Resistant Aluminum Ei30 Glass Walls With Doors - 85.02 M2, - Widening The Corridor By Demolishing And Building New Partition Walls In Rooms 1.12, 1.13, 1.14. New Partition Walls Made Of Aerated Concrete Blocks. 7.5 And 11.5 Cm - 26.48 M2, - Installation Of Double-Leaf Aluminum Glass Doors D-12 (2 Pcs.) In Corridors 1.10, 1.25 - 8.52 M2, - Installation Of Oak Parquet Floor In Rooms 1.11 (Mirror Room) And 1.24 (Gallery) - 156.36 M2,‒ Laying Floors With R10 60X60 Ceramic Tiles In Rooms 1.23, 1.25, 1.16 - 97.11 M2,‒ Laying Floors With Pvc Lining In Office Rooms 1.12, 1.13, 1.14 - 53.28 M2,‒ Supplementing Cement-Lime Plasters On Walls And Ceilings And Gypsum Plasters – 741.64 M2, Painting With Latex Paints – 740.14 M2, Mosaic Plasters Up To A Height Of 1.50 M From The Floor In Corridors (1.10, 1.16, 1.25) – 69.90 M2, Installation Of Wooden Panel Doors For Office Rooms – 14.4 M2,‒ Construction Of Plasterboard Casing For Supply And Exhaust Mechanical Ventilation In The Rooms As Above. And In Rooms 1.15 (Adult Reading Room) And 1.20 (Childrens Reading Room) - 45.31 M2, - Construction Of A Galvanized Support Structure Made Of Hea Steel Profiles On The Roof For Nw4 And Nw5 Ventilation Units (Total 1250 Kg).2) In The Sanitary Industry, Works Consisting Primarily Of: - Installation Of Nw4 And Nw5 Ventilation Units Together With Air Conditioning Units, - Execution All Rectangular Ventilation Ducts - 132.87 M2 With 40 Mm Thick Thermal Insulation For Nw4 And Nw5 Units (Including Rooms 1.15 And 1.20) - 107.42 M2 And Protective Jackets Made Of Galvanized Sheet - 150.39 M2, - Implementation Of Technological Heating Installation From Welded Pipes For Nw4 And Nw5 Units From Welded Steel Pipes 20 Mm - 55.0 M, And Filling With Glycol, - Construction Of Two 25 Mm Hydrants And Semi-Rigid Hoses In Hydrant Cabinets, With Stainless Steel Installation In Corridors 1.25 And 1.10, - Completion Of The Central Heating Installation. Made Of Galvanized Steel Pipes In The Press Connection System 15-35 Mm - 191.5 M With The Replacement Of 25 Cast Iron Radiators With Single- And Double-Shell S
|