|
The Subject Of The Order Is The Renovation Of Womens And Mens Toilets, Located On The Ground Floor In The Southern Wing Of Pavilion A-2. All Installations, Fittings, Accessories, As Well As The Finishing Of Walls, Floors And Ceilings Are Subject To Renovation. One Of The Bathrooms Is To Be Intended For Ozn. The Usable Area Of The Toilets On The Ground Floor Is Approx. 21.2 M2 (Womens Bathroom 6.9 M2 + Mens Bathroom 14.3 M2). The Scope Of Renovation Works Includes: • Disassembly Of Bathroom Equipment, • Demolition And Demolition Works (Demolition Of Walls, Doors, Sidelights, Hpl Walls, Cutting Off Tiles On Walls And Floors, Dismantling Of Installations, Removal Of Window Sills, Dismantling Suspended Ceilings, Cutting Off The Screed And Leveling The Level Between The Corridor And The Bathroom (No Threshold), • Removal And Disposal Of Rubble, • New Division Of Rooms Separated By Plasterboard Walls (According To Pt), • Installation Of Frames And Installation Risers With Plasterboards, • Construction Of New Suspended Ceilings, • Plugging Old Inactive Installation Revisions, Ventilation Grilles, Plugging Installation Holes In The Ceiling, • Delivery And Installation Of New Internal Door Joinery, • Installation Of Walls Separating Toilet Cabins, • Finishing Of Walls With Tiles, • Installation Of New Window Sills, • Finishing Works On Walls And Ceilings (Painting, Plastering, Tiling Works), • Implementation Of Moisture-Proof Insulation, • Implementation Of Additional Wall Reinforcements For Installation Of Accessories, • Preparation Of A New Screed In Accordance With Pt And Finishing It With Stoneware, • Equipping Bathrooms With Fittings And Accessories, As Well As Bathroom Accessories: Paper Dispenser, Soap Dispenser, Etc. (Including Accessories Adapted To The Needs Of Ozn), • Delivery And Installation Of Internal Doors, • Installation Of Water And Sewage Systems, • Replacement Of Radiators And Adaptation Of The Central Heating System With New Radiators, • Installation Of Exhaust Ventilation With A Roof Fan Along With The Necessary Equipment, Flaps, Valves, Dampers, Control And Other Accompanying Works, • Construction Of The Toilet Sewage System With Sewage Pipes, Approaches And Exhaust Vents To The Roof, • Construction Of Water Installations: Cold, Hot, Circulation, Connections To All Sanitary Utensils And Other Necessary Accompanying Works, • Reconstruction Of Connections With Water And Sewage Installations For Rooms Adjacent To Toilets, • Replacement Of The Electrical Installations Powering Plug Sockets, Hand Dryers, Ceiling Lighting (Including Lighting). Emergency/Evacuation), Lighting Above The Mirror And The Floor Electrical Switchgear While Maintaining The Existing Active Receiving Circuits (For The Entire Order (Materials, Equipment, Equipment, Labor)) For The Works Covered By The Scope Of The Order, Pa. 36 Months (3 Years) In Accordance With The Conditions Specified In The Warranty Statement
|