1. The Subject Of The Order Is The Design And Execution Of Construction, Assembly And Supply Works As Part Of The Task: Installation Of A Retention Tank For Storing Drinking Water At The Sokolniki Water Treatment Plant. The Task Is Carried Out In The Design-Build Formula.2. The Task Includes In Particular: 1) Pre-Design Stage: A) Obtaining Or Preparing Starting Materials For Design, Including Those Necessary To Submit An Application For A Building Permit Or Reporting Construction Works, Depending On Legal Requirements, B) Obtaining A Final Decision On Determining The Location Of A Public Purpose Investment, If Necessary, C) Carrying Out (Before Implementing The Subject Of The Order) A Site Visit In Order To Detail The Necessary Construction, Construction And Assembly, Installation And Other Works In The Building, D) Development Of The Initial Design Concept, Including The Color Concept Of The Façade And Its Agreement With The User Of The Facility And The Ordering Party Within 30 Days From The Date Of Signing The Contract, 2) Design Stage: A) Preparation Of The Required Construction Designs, Technical Designs And Cost Estimates In Accordance With The Requirements Contained In The Act Of July 7, 1994 Construction Law And The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design (In The Scope Of Investment Implementation) - B) Positive Opinion Of The State District Sanitary Inspector Regarding The Proposed Materials And Their Compliance With Sanitary Requirements, C) Development Of The Technical Specification For The Execution And Acceptance Of Works Specifying The Standards (Quality) Of Construction Works, Taking Into Account The Properties That Should Be Possessed By The Products/Construction Materials To Be Used To Perform The Described Construction Works (In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program), D) Performing Authors Supervision. 3) Construction And Assembly Stage: Performance Of All Construction, Demolition, Construction And Assembly, Installation And Other Works In The Suw Sokolniki Building Based On The Design Documentation And Pfu Prepared And Approved By The Ordering Party And The User, In Particular: A) Installing A Tank With A Capacity Of 150 M3, Made Of Low-Carbon Steel Placed On A Reinforced Concrete Pedestal, B) Construction Of The Tanks Technological Equipment, C) Construction Of Technological Pipelines, D) All Accompanying Works That Will Be Necessary To Be Carried Out On The Basis Of The Developed Design Documentation And Pfu, E) Functional Integration Of The Tank Into The Existing Suw Technological Installation.3. Location Of The Facility: Voivodeship: Łódź Province: Wieruszów Commune: Sokolniki Town: Sokolniki.4. A Detailed Descrip
Contact Information
Address
Gmina Sokolniki,Sokolniki,98-420,Łódzkie,Pl714 - Sieradzki
Email
zamowienia@sokolniki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114845172
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.