Substation Construction Work – Pécel 132/22 Kv Substation Establishment. In The Framework Of A Business Contract, The Construction Works Of The 132/22 Kv Substation In Pécel Are Carried Out In Accordance With The Implementation Plan Documentation, Which Is An Integral Part Of The Public Procurement Documentation. Complete Architectural And Electrical Technological Construction Of 1 8,176 M2 132/22 Kv Substation On The 11,858 M2 Area Provided By The Bidder: - Architectural Preparation Of The Substation Construction Area; - Construction Of The Access Road And Road Connection Necessary To Approach The Substation; - Creation Of A Rainwater Drainage And Drainage System Around The Substation Area; - Complete Construction Of 1 Substation Outdoor Area Consisting Of 1 Cable Field, 1 Free Wire Field, 1 Rail Breaker And 2 Naf/Köf Transformer Fields Made Of Traditional Outdoor Devices; - Complete Construction Of 2 Open-Air Naf/Köf Transformer Bases And The Corresponding Star Point Formation Base, As Well As A Flame Protection Wall; - Complete Installation Of The Bhtr Station For The Construction Of The Mobile Hfkv System, Installation Of The Grounding And Secondary Isolating Cabinet Of The Mobile Hfkv System; - Construction Of The Device Base Necessary For The Placement Of 2 Switch, 1 Auxiliary Operation And 1 Control Container; - Naf Protection And Ir. Technical Pre-Installation Of Cabinets, Telecommunications And Common Cabinets, Direct And Alternating Current Auxiliary Operating Cabinets At The Contractors Site; - Delivery Of Four Containers, Weighing 20-25 Tons Each, From The Customers Premises To The Substation For Electrical Technological Assembly, Placing Them On The Foundation; - Delivery Of 20 Pieces Of 22Kv Switchgear From The Customers Site For Electrical Technological Assembly To The Substation, - Carrying Out The Necessary Final Assembly Work On Switchgear, Control And Auxiliary Plant Containers; - Naf Protection And Ir. Technical On-Site Installation Of Cabinets, Telecommunications And Common Cabinets, Direct And Alternating Current Auxiliary Operating Cabinets, Battery Cells; - Connecting The Equipment Placed In The Containers To Each Other And To The Substations Outdoor Equipment; - Establishment Of 1 Drilled Well To Ensure The Substations Water Supply; - Construction Of A Storage Structure For The Storage Of Waste Water Generated In The Substation; - Construction Of 1 Fire Water Storage Tank; - Construction Of An Artefact For The Cleaning And Draining Of Rainwater, Sometimes Contaminated With Oil, Escaping From The Transformer Foundations; - Installation Of Monitoring Wells Next To The Oil-Contaminated Rainwater Purification Structure - Construction Of A Fence Around The Area Of The Substation; - Construction Of Transformer And Device Transport Roads Within The Substation. The Above Tasks Can Be Found In Detail In The Technical Documents.
Contact Information
Contact No.
+36 208074216
Email
marton.hadnagy@eon-hungaria.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114794311
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.